SIMULATION TECHNOLOGIES FOR PLANNING HEAVY CONSTRUCTION PROCESSES

被引:19
|
作者
VANEGAS, JA
BRAVO, EB
HALPIN, DW
机构
[1] School of Civ. Engrg., Georgia Institute of Technology, Atlanta
[2] Project Planning and Control, Dragados y Construcciones, Madrid, SA 2820
[3] Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette
关键词
D O I
10.1061/(ASCE)0733-9364(1993)119:2(336)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Heavy construction projects, such as dams and tunnels, closely integrate design and construction and require the project manager or the project engineer to be knowledgeable and familiar with: (i) Different types of heavy construction plant and equipment; and (2) different construction methods that may be applicable to a given project. However, to effectively define these two elements, different possible scenarios, under different conditions and constraints, must be explored with both a technology and process focus, and a resource use focus. This task requires the development of descriptive, analytical, and decision-making. models, which accurately represent and simulate these processes, and experimentation with different alternatives under different conditions. Until relatively recently, the analytical and operational tools that have been available to practitioners to achieve this, have been complex and difficult to learn and use. The Cyclic Operations Network (CYCLONE) microcomputer-based simulation methodology presents a viable alternative to overcome these barriers. This paper describes the implementation of this system within the division of project planning and control of a large Spanish heavy construction firm, using two specific case-study applications.
引用
收藏
页码:336 / 354
页数:19
相关论文
共 50 条
  • [1] CONSTRUCTION LOGISTICS PLANNING BY SIMULATION
    Voigtmann, Julia
    Bargstaedt, Hans-Joachim
    [J]. PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 3201 - 3211
  • [2] SIMULATION FOR CONSTRUCTION PLANNING AND CONTROL
    MCCAHILL, DF
    BERNOLD, LE
    [J]. EXCELLENCE IN THE CONSTRUCTED PROJECT, 1989, : 349 - 359
  • [3] SIMULATION OF NONSTEADY CONSTRUCTION PROCESSES
    BERNOLD, LE
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (02): : 163 - 178
  • [4] Simulation of complex construction processes
    Ioannou, PG
    Martinez, JC
    [J]. 1996 WINTER SIMULATION CONFERENCE PROCEEDINGS, 1996, : 1321 - 1328
  • [5] Use of simulation in construction processes
    Ramon-Elizondo, Alejandro
    Barboza-Arguedas, Roger
    [J]. TECNOLOGIA EN MARCHA, 2019, 32 (04): : 145 - 157
  • [6] Path planning, modeling and simulation of an autonomous articulated heavy construction machine performing a loading cycle
    Alshaer, B. J.
    Darabseh, T. T.
    Alhanouti, M. A.
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (07) : 5315 - 5325
  • [7] Supporting construction processes using workflow technologies
    Yeoh, ML
    Chung, PWH
    Anumba, CJ
    El-Hamalawi, A
    Motawa, I
    [J]. INNOVATIVE DEVELOPMENTS IN ARCHITECTURE, ENGINEERING AND CONTRUCTION, 2003, : 453 - 462
  • [8] A simulation environment for construction site planning
    Tawfik, H
    Fernando, T
    [J]. FIFTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALISATION, PROCEEDINGS, 2001, : 199 - 204
  • [9] Use of statistical simulation in construction planning
    Rogovenko, Tatyana
    Zaitseva, Marina
    [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2016 - SMART CITY, 2017, 106
  • [10] CONSTRUCTION PLANNING SIMULATION AT GRU AIRPORT
    Fioroni, Marcelo Moretti
    Franzese, Luiz Augusto G.
    Costa, Marcello
    Kuhn, Andre
    [J]. 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 2854 - +