共 50 条
- [1] THE ESTABLISHMENT OF INFRASTRUCTURE FOR THE GROOTEGELUK COAL-MINE JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1982, 82 (12): : 353 - 355
- [2] MODIFICATIONS TO THE COAL-PREPARATION CIRCUIT AT THE GROOTEGELUK COAL-MINE TO IMPROVE ITS EFFICIENCY JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1992, 92 (07): : 183 - 183
- [3] THE PLANNING AND ESTABLISHMENT OF THE COAL-BENEFICIATION PLANT AT GROOTEGELUK JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1982, 82 (12): : 356 - 364
- [4] OPERATING EXPERIENCE WITH A MOBILE IN-PIT CRUSHING SYSTEM AT GROOTEGELUK COAL-MINE SOUTH AFRICAN MECHANICAL ENGINEER, 1982, 32 (11): : 312 - 319
- [7] CAPITAL AND COST CONTROL-SYSTEMS USED IN THE ESTABLISHMENT OF THE GROOTEGELUK-COAL-MINE JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1982, 82 (12): : 370 - 376
- [8] THE EFFECT OF CONSUMER SPECIFICATIONS ON THE PLANNING AND OPERATION OF A COAL-MINE JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1984, 84 (06): : 153 - 158
- [9] GEOPHYSICAL CONTRIBUTIONS TO AUSTRALIAN COAL-MINE PLANNING - PREFACE GEOEXPLORATION, 1987, 24 (4-5): : 283 - 283
- [10] COAL-MINE SOIL AND OVERBURDEN SURVEYS AND RECLAMATION PLANNING PROCEEDINGS OF THE CONFERENCE - RECLAMATION, A GLOBAL PERSPECTIVE, VOLS 1 AND 2, 1989, : 579 - 588