共 50 条
- [1] THE PLANNING AND ESTABLISHMENT OF THE GROOTEGELUK COAL-MINE [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1982, 82 (12): : 341 - 352
- [2] MODIFICATIONS TO THE COAL-PREPARATION CIRCUIT AT THE GROOTEGELUK-COAL-MINE TO IMPROVE ITS EFFICIENCY [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1992, 92 (02): : 53 - 61
- [3] THE ESTABLISHMENT OF INFRASTRUCTURE FOR THE GROOTEGELUK COAL-MINE [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1982, 82 (12): : 353 - 355
- [4] ESTABLISHMENT OF OPTIMUM CONTROL-SYSTEMS [J]. ENERGIA ES ATOMTECHNIKA, 1986, 39 (11): : 481 - 488
- [8] COMPUTERIZED CONTROL-SYSTEMS AT THE KIRUNA MINE [J]. JKA-JERNKONTORETS ANNALER, 1980, 164 (06): : 20 - 21
- [9] CONTROL-SYSTEMS USED IN GRAIN DRYING [J]. MILLING FEED AND FERTILISER, 1980, 163 (03): : 38 - 38
- [10] COST OPTIMIZATION OF TRITIUM CONTROL-SYSTEMS [J]. NUCLEAR TECHNOLOGY-FUSION, 1983, 4 (02): : 1127 - 1130