共 48 条
- [32] CONSTRUCTION AND OPERATION OF HOT METAL TREATMENT IN KEIHIN-WORKS, NIPPON-KOKAN-KK [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S271 - S271
- [33] OPERATION AND QUALITY OF HIGH CROWN CONTROL MILL (HC MILL) .3. DEVELOPMENT OF CROWN PREDICTION MODEL FOR HIGH CROWN CONTROL MILL AT MIZUSHIMA HOT STRIP MILL OF KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S323 - S323
- [34] DEVELOPMENT OF TECHNOLOGY ON CONNECTION PICKLING LINE WITH COLD TANDEM MILLS .1. CONSTRUCTION AND OPERATION OF NO-2 PICKLING LINE AND NO-1 COLD TANDEM FULLY CONTINUOUS MILLS AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORPORATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S367 - S367
- [38] OPERATION AND QUALITY OF HIGH CROWN CONTROL MILL (HC MILL) .4. DEVELOPMENTS OF STRIP CROWN SET UP SYSTEM OF HIGH CROWN CONTROL MILL AT MIZUSHIMA HOT STRIP MILL OF KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S324 - S324
- [39] OPERATIONAL RESULTS OF NEW STEEL MAKING PROCESS .5. HOT METAL PRETREATMENT OPERATION BY SLIGHT DE-SI TREATMENT [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S211 - S211