共 50 条
- [31] PHASE-CONTROL KEYS REPLACEMENT OF BRIDGE DECK HIGHWAY & HEAVY CONSTRUCTION, 1984, 127 (07): : 32 - 33
- [32] Replacement of bearings in the Golden Horn Bridge, Turkey Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2000, 10 (02): : 121 - 123
- [33] Fatigue characteristic of asphalt concrete pavement on cement concrete bridge deck J. Traffic Transp. Eng., 2006, 1 (39-43):
- [37] PERMEABILITY OF HYBRID CONCRETE FOR SUSTAINABLE BRIDGE DECK PAVEMENT II INTERNATIONAL CONFERENCE ON CONCRETE SUSTAINABILITY - ICCS16, 2016, : 750 - 758
- [38] Fatigue life estimation for reinforced concrete bridge deck Wang, C.-S. (wcs2000wcs@163.com), 1600, Editorial Department of Journal of Chang'an University, Southern Middle Section of the Second Circular Road, Xi'an, 710064, China (33):
- [39] Objective condition states for concrete bridge deck assessment INNOVATIONS IN BRIDGE ENGINEERING TECHNOLOGY, 2007, : 197 - 204