共 50 条
- [21] FURNACE COMPUTER CONTROL .3. FURNACE COMPUTER CONTROL OF BAR AND ROD MILL AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1184 - 1184
- [25] CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT EQUIPMENT [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S213 - S213
- [26] CONSTRUCTION AND OPERATION OF HOT METAL PRE-TREATMENT IN CHIBA-WORKS, KAWASAKI-STEEL-CORPORATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S109 - S109
- [27] CONSTRUCTION OF THE NEW REHEATING FURNACE AT KIMISTU PLATE MILL, NIPPON-STEEL-CORP .1. OUTLINE OF THE HIGH EFFICIENT REHEATING FURNACE WITH LOW HEAT INERTIA [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S320 - S320
- [28] RECONSTRUCTION OF OITA HOT STRIP MILL, NIPPON-STEEL-CORP .2. APPLICATION OF WORK ROLL SHIFT TO HOT STRIP MILL IN OITA WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1219 - 1219
- [29] TOTAL BAR AND ROD ROLLING INFORMATION-SYSTEM AT MIZUSHIMA WORKS, KAWASAKI STEEL CORP .1. THE OUTLINE OF TOTAL BAR AND ROD ROLLING INFORMATION-SYSTEM AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S305 - S305