共 50 条
- [1] Planning stability in material requirements planning systems [J]. PLANNING STABILITY IN MATERIAL REQUIREMENTS PLANNING SYSTEMS, 2002, 515 : 1 - +
- [7] Advanced Material Requirements Planning Systems for Semiconductor Manufacturing at IBM [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 107 - 110
- [8] COMPARISONS OF MATERIAL REQUIREMENTS PLANNING AND REORDER POINT SYSTEMS. [J]. Simulation Councils Proceedings Series, 1984, 12 (02): : 47 - 54
- [9] Statistical analysis of yield loss in material requirements planning systems [J]. 1996, Taylor & Francis Ltd, Basingstoke, United Kingdom (07):