GROUND MOVEMENTS CAUSED BY TUNNELLING IN CHALK

被引:0
|
作者
PRIEST, SD [1 ]
BURMAN, BC [1 ]
机构
[1] COFFEY & PARTNERS PTY LTD,SYDNEY,AUSTRALIA
关键词
D O I
10.1680/iicep.1976.3349
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:811 / 814
页数:4
相关论文
共 50 条
  • [21] Effects of cover depth on ground movements induced by shallow tunnelling
    Minh Ngan Vu
    Broere, Wout
    Bosch, Johan
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 50 : 499 - 506
  • [22] Use of diaphragm walls to mitigate ground movements induced by tunnelling
    Bilotta, E.
    [J]. GEOTECHNIQUE, 2008, 58 (02): : 143 - 155
  • [23] A structure's influence on tunnelling-induced ground movements
    Potts, DM
    Addenbrooke, TI
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 1997, 125 (02) : 109 - 125
  • [24] GROUND DISTURBANCE CAUSED BY SHIELD TUNNELLING IN A STIFF, OVERCONSOLIDATED CLAY
    ATTEWELL, PB
    FARMER, IW
    [J]. ENGINEERING GEOLOGY, 1974, 8 (04) : 361 - 381
  • [25] Research on consolidation settlement of ground surface caused by shield tunnelling
    Wang Zhi-liang
    Liu Ming
    Xie Jian-bin
    Shen Lin-fang
    [J]. ROCK AND SOIL MECHANICS, 2013, 34 : 127 - 133
  • [26] Centrifuge modelling of the influence of surface structures on tunnelling induced ground movements
    Taylor, RN
    Grant, RJ
    [J]. TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 261 - 266
  • [27] Numerical analysis of framed building response to tunnelling induced ground movements
    Fu, Jinyang
    Yu, Zhiwu
    Wang, Shuying
    Yang, Junsheng
    [J]. ENGINEERING STRUCTURES, 2018, 158 : 43 - 66
  • [28] Numerical modeling of ground movements caused by tunneling
    Benmebarek, S
    Kastner, R
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 2000, 37 (06) : 1309 - 1324
  • [29] GROUND MOVEMENTS CAUSED BY BRACED EXCAVATIONS - CLOSURE
    OROURKE, TD
    [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1983, 109 (03): : 487 - 487
  • [30] LABORATORY MODELING OF GROUND MOVEMENTS CAUSED BY PIPEJACKING
    ROGERS, CDF
    CHAPMAN, DN
    [J]. GROUND ENGINEERING, 1994, 27 (08): : 27 - 36