SLAUGHTER ESTATE UNIT TERTIARY MISCIBLE GAS PILOT RESERVOIR DESCRIPTION

被引:4
|
作者
ADER, JC
STEIN, MH
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 1984年 / 36卷 / 05期
关键词
D O I
10.2118/10727-PA
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A reservoir description for the Slaughter Estate Unit tertiary pilot and surrounding area and the procedure that was used to obtain it are discussed. The procedure is based on matching waterflood performance prior to pilot miscible gas injection with a black oil reservoir simulator. An initial estimate of the reservoir description is obtained from petrophysical data and single-well pressure transient tests. The initial estimate is then modified by a trial and error procedure until a good match between the actual and calculated waterflood performance is obtained. It was determined that the Slaughter Estate Unit tertiary pilot had an original oil in place (OOIP) of 642,400 STB left bracket 102 133 stock-tank m**3 right bracket . A waterflood prediction derived from the reservoir description in this work indicates that a primary-plus-secondary recovery through Sept. 30, 1983, of 49. 6% OOIP would have been obtained from the pilot if waterflood operations had been continued.
引用
收藏
页码:837 / 845
页数:9
相关论文
共 50 条
  • [41] A Case Study on Miscible and Immiscible Gas-Injection Pilots in a Middle East Carbonate Reservoir in an Offshore Environment
    Kumar, Jitendra
    Agrawal, Pawan
    Draoui, Elyes
    SPE RESERVOIR EVALUATION & ENGINEERING, 2017, 20 (01) : 19 - 29
  • [42] Thought and system of lithologic gas reservoir description and prediction techniques in exploration phase
    Cao, Z.
    Zhao, Y.
    Liu, Q.
    Chen, G.
    Tianranqi Gongye/Natural Gas Industry, 2001, 21 (06): : 42 - 45
  • [43] Evaporative gas turbine cycle - A description of a pilot plant and operating experience
    Lindquist, Torbjorn O.
    Rosen, Per M.
    Torisson, Tord
    2000, American Society of Mechanical Engineers (40):
  • [44] CURRY UNIT - SUCCESSFUL WATERFLOOD IN A DEPLETED CARBONATE RESERVOIR WITH HIGH GAS SATURATION
    HASAN, SM
    JOURNAL OF PETROLEUM TECHNOLOGY, 1974, 26 (DEC): : 1359 - 1364
  • [45] Fault-controlled oil and gas reservoir unit division based on graph
    Zhou, Cheng
    Fei, Yifeng
    He, Xin
    Cai, Hanpeng
    Yao, Xingmiao
    Hu, Guangmin
    ADVANCES IN GEO-ENERGY RESEARCH, 2025, 15 (01): : 68 - 78
  • [46] Optimal Parametric Design for Water-Alternating-Gas (WAG) Process in a CO2-Miscible Flooding Reservoir
    Chen, S.
    Li, H.
    Yang, D.
    Tontiwachwuthikul, P.
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2010, 49 (10): : 75 - 82
  • [47] Flow description of gas well in basement granite reservoir from well test analysis
    Oetomo, H. K.
    Sitaresmi, R.
    Laksana, D. P.
    4TH ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE, 2019, 2019, 1402
  • [48] 'Four-pore' modeling and its quantitative logging description of shale gas reservoir
    Li, Jun
    Lu, Jing
    Li, Zheng
    Wu, Qingzhao
    Nan, Zeyu
    Oil and Gas Geology, 2014, 35 (02): : 266 - 271
  • [49] The Lessons Learned From Miscible Gas Flooding in Naturally Fractured Reservoirs: Integrated Studies, and Pilot and Field Cases
    Jamaloei, B. Yadali
    Kharrat, Riyaz
    PETROLEUM SCIENCE AND TECHNOLOGY, 2012, 30 (17) : 1802 - 1812
  • [50] HIGH-PRESSURE MISCIBLE GAS DISPLACEMENT PROJECT, BRIDGER-LAKE UNIT, SUMMIT COUNTY, UTAH
    BURT, RA
    JOURNAL OF PETROLEUM TECHNOLOGY, 1971, 23 (NOCT): : 1231 - &