共 50 条
- [23] SYSTEM MODEL TO INVESTIGATE THE COOLING CIRCUMSTANCES IN STEAM-GENERATORS OF FORCED AND NATURAL CIRCULATION [J]. ENERGIA ES ATOMTECHNIKA, 1979, 32 (02): : 74 - 79
- [26] RESULTS OF AN INVESTIGATION INTO START-UP AND SHUT-DOWN OPERATION OF CENTRAL POWER-STATION UNIT STEAM-GENERATORS IN BULGARIA [J]. ENERGIETECHNIK, 1977, 27 (09): : 347 - 353
- [27] TRANSIENT THERMODYNAMIC, THERMAL AND STRUCTURE ANALYSIS OF A STEAM TURBINE DURING ITS START-UP [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2010, VOL 4, PTS A AND B, 2010, : 1103 - 1112
- [28] NUMERICAL-SIMULATION OF TRANSIENT 2-PHASE NATURAL CIRCULATION IN A REACTOR WITH ONCE-THROUGH STEAM-GENERATORS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 47 : 504 - 505
- [29] AUTOMATIC DEWATERING OF STEAM TURBINES DURING START-UP [J]. BRENNSTOFF-WARME-KRAFT, 1968, 20 (03): : 115 - &