共 27 条
- [21] Production run time setting by considering time value of money for imperfect production process [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2024, 45 (01): : 199 - 204
- [24] Economic selection of mean value for a Multiple-Product-Manufacturing-Process with two-sided specification limits [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (04): : 348 - 354