共 34 条
- [31] WAYS OF INTENSIFYING WORKING OF LARGE BLAST-FURNACES AT KARAGANDA-COMBINE DURING THEIR OPERATION WITH HIGH SLAG VOLUME STEEL IN THE USSR, 1980, 10 (06): : 289 - 294
- [32] OPERATION OF BLAST-FURNACES ON TUYERES OF DIFFERENT FORM AND AREA OF OUTLET CROSS-SECTION - COMMUNICATION-2 STEEL IN THE USSR, 1981, 11 (05): : 260 - 261
- [33] MATERIAL FLOW SIMULATION AS AID FOR PLANNING EXTENSION OF ORE HANDLING AND TRANSPORTATION FACILITIES BETWEEN WORKS HARBOR, SINTERING PLANTS, AND BLAST-FURNACES STAHL UND EISEN, 1977, 97 (17): : 815 - 820