Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation

被引:146
|
作者
Cheah, Charles Y. J. [1 ]
Liu, Jicai [1 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore, Singapore
关键词
Build-operate-transfer; concessions; infrastructure projects; negotiation; real option;
D O I
10.1080/01446190500435572
中图分类号
F [经济];
学科分类号
02 ;
摘要
In Build-Operate-Transfer (BOT) infrastructure projects, host governments often provide subsidies, guarantees or alternative forms of support as incentives to attract private sector participation. A guaranteed level of minimum revenue, for example, can be specially designed to alleviate the concern of demand risk. Although researchers have generally acknowledged the significance of subsidies and guarantees leading toward successful negotiation, there is a lack of attempt to evaluate these concessions quantitatively. Without a deeper understanding of the value of these concessions, risk and reward may not be equitably matched in the proposed terms and arrangements. In this paper, relevant elements of a contractual package are treated as a form of real options. A proposition is put forward to incorporate the value of such options into the negotiation framework. By relying on simplifying assumptions on risk preferences, these options can be evaluated using Monte Carlo simulation of a discounted cash flow (DCF) model. The methodology is applied to the case of the Malaysia-Singapore Second Crossing, which shows that the value of a guarantee can indeed be significant relative to the basic net present value. The case study also highlights other aspects of flexibility in the design and execution of a project.
引用
收藏
页码:545 / 554
页数:10
相关论文
共 50 条
  • [31] Infrastructure linking for placement of Charging stations using Monte Carlo simulation
    Tayyab, Muhammad
    Helm, Sebastian
    Hauer, Ines
    Brinken, Julius
    Schmidtke, Niels
    2020 6TH IEEE CONGRESS ON INFORMATION SCIENCE AND TECHNOLOGY (IEEE CIST'20), 2020, : 436 - 441
  • [32] Experiments with parallel Monte Carlo simulation for pricing options using PVM
    Rabaea, A
    Rabaea, M
    RECENT ADVANCES IN PARALLEL VIRTUAL MACHINE AND MESSAGE PASSING INTERFACE, PROCEEDINGS, 2000, 1908 : 330 - 337
  • [33] Valuation of Infrastructure Projects: Review of the Real Options Literature
    Marques, Naielly Lopes
    Sanchez, Liliana Dennis Mejia
    Brandao, Luiz Eduardo Teixeira
    Bastian-Pinto, Carlos de Lamare
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (05) : 174 - 183
  • [34] Valuing generation planning projects for electric utilities based on real options
    Wang, CH
    Min, KJ
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 62, 2000, : 51 - 56
  • [35] A real options approach to valuing strategic flexibility in uncertain construction projects
    Ford, David N.
    Lander, Diane M.
    Voyer, John J.
    Construction Management and Economics, 2002, 20 (04) : 343 - 351
  • [36] Upgrading the UK Broadband Infrastructure by Monte Carlo Simulation
    Lee, W. T.
    Mueller, K.
    PROGRESS IN INDUSTRIAL MATHEMATICS AT ECMI 2008, 2010, 15 : 241 - +
  • [37] Using forward Monte-Carlo simulation for the valuation of American barrier options
    Daniel Wei-Chung Miao
    Yung-Hsin Lee
    Jr-Yan Wang
    Annals of Operations Research, 2018, 264 : 339 - 366
  • [38] Using forward Monte-Carlo simulation for the valuation of American barrier options
    Miao, Daniel Wei-Chung
    Lee, Yung-Hsin
    Wang, Jr-Yan
    ANNALS OF OPERATIONS RESEARCH, 2018, 264 (1-2) : 339 - 366
  • [39] A Practical Application of Monte Carlo Simulation for Options Pricing
    Srivastava, Anubha
    Bajaj, Rythem
    NMIMS MANAGEMENT REVIEW, 2014, 25 : 60 - 77
  • [40] Pricing of delayed options based on Monte Carlo simulation
    Liu, Qingchun
    Tian, Rongjie
    Sha, Zongquan
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 212 - 216