共 50 条
- [42] Horizontal-well cleaning and evaluation using concentric coiled tubing JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (05): : 52 - 52
- [43] Influence of the horizontal-well length on production rate and water cut JPT, Journal of Petroleum Technology, 2002, 54 (11):
- [44] FORMATION DAMAGE EFFECTS ON HORIZONTAL-WELL FLOW EFFICIENCY - REPLY JOURNAL OF PETROLEUM TECHNOLOGY, 1991, 43 (12): : 1523 - 1523
- [45] FORMATION DAMAGE EFFECTS ON HORIZONTAL-WELL FLOW EFFICIENCY - DISCUSSION JOURNAL OF PETROLEUM TECHNOLOGY, 1991, 43 (12): : 1521 - 1522
- [46] Study on the horizontal-well injection profile logging interpretation technology MULTIPHASE FLOW: THE ULTIMATE MEASUREMENT CHALLENGE, PROCEEDINGS, 2007, 914 : 542 - +
- [47] Horizontal-well pilot waterflood tests shallow, abandoned field Oil and Gas Journal, 1991, 89 (31): : 46 - 47
- [48] FIELD APPLICATION OF A METHOD FOR INTERPRETATION OF HORIZONTAL-WELL TRANSIENT TESTS SPE FORMATION EVALUATION, 1994, 9 (01): : 23 - 31
- [49] Combined approach improves fault description for horizontal-well geosteering JPT, Journal of Petroleum Technology, 2019, (01): : 60 - 62
- [50] Impact of formation damage and completion impairment on horizontal-well productivity JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (10): : 72 - 73