A SIMPLE INSPECTION POLICY FOR THE DETECTION OF FAILURE

被引:1
|
作者
DESENNA, V [1 ]
SHAHANI, AK [1 ]
机构
[1] UNIV SOUTHAMPTON,FAC MATH STUDIES,SOUTHAMPTON SO9 5NH,HANTS,ENGLAND
关键词
D O I
10.1016/0377-2217(86)90241-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:222 / 227
页数:6
相关论文
共 50 条
  • [41] Failure assessment of Mash Seam Weld breakage and development of online weld inspection system for early detection of weld failure
    Bonikila, Pradeep Reddy
    Indimath, Shivanandan S.
    Shajan, Nikhil
    ENGINEERING FAILURE ANALYSIS, 2022, 133
  • [42] A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events
    Huynh, K. T.
    Barros, A.
    Berenguer, C.
    Castro, I. T.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (04) : 497 - 508
  • [43] Two-stage failure modeling and optimal periodic inspection policy during the extended warranty period
    Heydari, Majeed
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2019, 14 (04) : 264 - 272
  • [44] Joint Optimization of Jobs Sequence and Inspection Policy for a Single System With Two-Stage Failure Process
    Taghipour, Sharareh
    Azimpoor, Samareh
    IEEE TRANSACTIONS ON RELIABILITY, 2018, 67 (01) : 156 - 169
  • [45] A joint optimal policy of inspection and age based replacement based on a three-stage failure process
    Yang, Ruifeng
    Kang, Jianshe
    Wang, Huijuan
    JOURNAL OF VIBROENGINEERING, 2015, 17 (06) : 3003 - 3022
  • [46] SIMPLE SYSTEM FOR INSPECTION OF MICROELECTROPHORETIC PATTERNS
    BACCELLIERE, L
    CUPELLO, A
    HULTBORN, R
    EXPERIENTIA, 1977, 33 (03): : 402 - 403
  • [47] A two-phase inspection policy for a single component preparedness system with a mixed time to failure distribution
    Cavalcante, Cristiano
    Scarf, Phil
    de Almeida, Adiel
    Cosmo de Silva, A. T.
    RELIABILITY, RISK AND SAFETY: THEORY AND APPLICATIONS VOLS 1-3, 2010, : 525 - +
  • [48] Simple inspection system eliminates defects
    Murray, Charles J.
    Design News (Boston), 1994, 49 (01):
  • [49] Inspection Models Considering the Overlapping of Inspection Span and Failure Downtime
    Zhang Xingfu
    Chen Maoyin
    Zhou Donghua
    CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2012, 20 (06) : 1167 - 1173
  • [50] A Simple Remote Auxiliary Inspection System
    Lee, Shih-Hsiung
    Yang, Chu-Sing
    2017 10TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2017), 2017, : 180 - 183