共 50 条
- [31] Minimizing makespan in a class of reentrant shops [J]. OPERATIONS RESEARCH, 1997, 45 (05) : 702 - 712
- [32] Minimizing the expected variation of waiting times in stochastic flow shop [J]. INFORMATION INTELLIGENCE AND SYSTEMS, VOLS 1-4, 1996, : 1536 - 1541
- [33] Minimizing weighted average flow time in dynamic job shops [J]. DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 1451 - 1453
- [36] Parallel machine scheduling for minimizing the makespan and the average flow-time [J]. 6TH INDUSTRIAL ENGINEERING RESEARCH CONFERENCE PROCEEDINGS: (IERC), 1997, : 186 - 191
- [40] A fluid heuristic for minimizing makespan in job shops [J]. OPERATIONS RESEARCH, 2002, 50 (04) : 692 - 707