共 50 条
- [1] MINIMIZING THE EXPECTED MAKESPAN IN STOCHASTIC FLOW SHOPS [J]. OPERATIONS RESEARCH, 1982, 30 (01) : 148 - 162
- [3] MINIMIZING THE EXPECTED FLOWTIME IN STOCHASTIC FLOW SHOPS [J]. IIE TRANSACTIONS, 1984, 16 (04) : 391 - 395
- [4] MINIMIZING THE EXPECTED FLOWTIME IN STOCHASTIC FLOW SHOPS. [J]. IIE Transactions (Institute of Industrial Engineers), 1984, 16 (04): : 391 - 395
- [5] STOCHASTICALLY MINIMIZING THE MAKESPAN IN FLOW SHOPS [J]. NAVAL RESEARCH LOGISTICS, 1984, 31 (04) : 551 - 557
- [8] On the NEH heuristic for minimizing the makespan in permutation flow shops [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (01): : 53 - 60
- [10] Automatic Design of Heuristics for Minimizing the Makespan in Permutation Flow Shops [J]. 2018 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2018, : 2403 - 2410