METHOD FOR CHECKING PERPENDICULARITY

被引:0
|
作者
MINAIRE, C [1 ]
机构
[1] FRENCH ARMYTECH SERV,PARIS,FRANCE
来源
MACHINERY AND PRODUCTION ENGINEERING | 1976年 / 128卷 / 3301期
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:252 / 253
页数:2
相关论文
共 50 条
  • [21] ON THE EUCLIDEAN CHARACTER OF THE PERPENDICULARITY RELATION
    VONNEUMANN, J
    LORCH, ER
    BULLETIN OF THE AMERICAN MATHEMATICAL SOCIETY, 1947, 53 (05) : 489 - 490
  • [22] A method for approximate equivalence checking
    Thornton, M
    Drechsler, R
    Günther, W
    30TH IEEE INTERNATIONAL SYMPOSIUM ON MULTIPLE-VALUED LOGIC, PROCEEDINGS, 2000, : 447 - 452
  • [23] A method to calibrate a camera using perpendicularity of 2D lines in the target observations
    Guan Xu
    Anqi Zheng
    Xiaotao Li
    Jian Su
    Scientific Reports, 6
  • [24] METHOD OF CHECKING SEGMENT POSITION
    ALLEN, DG
    AMA ARCHIVES OF OPHTHALMOLOGY, 1954, 52 (03): : 456 - 457
  • [25] METHOD OF CHECKING OHMMETERS AND FARADMETERS
    LYUBIMOV, LI
    FRIDMAN, ID
    MEASUREMENT TECHNIQUES, 1979, 22 (04) : 461 - 462
  • [26] CHECKING TIRES BY AN ULTRASONIC METHOD
    RYZHOV, VI
    IONOV, VA
    INDUSTRIAL LABORATORY, 1960, 26 (11): : 1428 - 1431
  • [27] A method to calibrate a camera using perpendicularity of 2D lines in the target observations
    Xu, Guan
    Zheng, Anqi
    Li, Xiaotao
    Su, Jian
    SCIENTIFIC REPORTS, 2016, 6
  • [28] Measurement method of perpendicularity, axis intersection, alignment error of five-axis simulator
    Space Control and Inertial Technology Research Center, Harbin Institute of Technology, Harbin
    150001, China
    不详
    200240, China
    Harbin Gongye Daxue Xuebao, 10 (1-6):
  • [29] Micro- and nano-scale spindle perpendicularity modulation method to enhance the quality of milled surfaces
    Lv, Bingrui
    Lin, Bin
    Zhang, Jinshuo
    Liu, Chunyan
    Wang, Longfei
    Sui, Tianyi
    INTERNATIONAL JOURNAL OF EXTREME MANUFACTURING, 2024, 6 (06)
  • [30] DEVICE FOR MEASURING DEVIATIONS FROM PERPENDICULARITY
    MURAVEV, BI
    MEASUREMENT TECHNIQUES, 1976, 19 (01) : 142 - 143