THE INTERRELATIONS OF THE CARONI RIVER BASIN ECOSYSTEMS AND HYDROELECTRIC POWER PROJECTS

被引:0
|
作者
MORALES, LC
GORZULA, S
机构
关键词
D O I
暂无
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
引用
收藏
页码:272 / 277
页数:6
相关论文
共 50 条
  • [31] Engineering and environmental management projects of small hydroelectric power plants
    Mariotoni, C.A.
    Badanhan, L.F.
    Informacion Tecnologica, 2001, 12 (02): : 93 - 97
  • [32] Fish passage mitigation at hydroelectric power projects in the United States
    Cada, GF
    FISH MIGRATION AND FISH BYPASSES, 1998, : 208 - 219
  • [33] RANKING HYDROELECTRIC POWER PROJECTS WITH MULTICRITERIA DECISION-ANALYSIS
    WENSTOP, FE
    CARLSEN, AJ
    INTERFACES, 1988, 18 (04) : 36 - 48
  • [34] HYDROELECTRIC POWER DEVELOPMENT AT VICTORIA FALLS ON ZAMBESI RIVER
    PIESOLD, DDA
    WALKER, BC
    MURDOCH, GB
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1975, 58 (AUG): : 435 - 451
  • [35] HYDROELECTRIC POWER DEVELOPMENT AT VICTORIA FALLS ON ZAMBEZI RIVER
    PIESOLD, DDA
    WALKER, BC
    MURDOCH, GB
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1974, 56 (AUG): : 275 - 301
  • [37] Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant
    Bongio, Marco
    Avanzi, Francesco
    De Michele, Carlo
    ADVANCES IN WATER RESOURCES, 2016, 94 : 318 - 331
  • [38] Influence of a Small Hydroelectric Power Station on the River Ecosysteme
    Valero, Enrique
    Alvarez, Xana
    Picos, Juan
    EUROPEAN JOURNAL OF SUSTAINABLE DEVELOPMENT, 2014, 3 (04): : 175 - 180
  • [39] Fall chinook salmon spawning in the tailraces of lower Snake River hydroelectric projects
    Dauble, DD
    Johnson, RL
    Garcia, AP
    TRANSACTIONS OF THE AMERICAN FISHERIES SOCIETY, 1999, 128 (04) : 672 - 679
  • [40] Large-scale hydroelectric projects and mountain development on the upper Yangtze River
    Yao Yonghui
    Zhang Baiping
    Ma Xiaoding
    Ma Peng
    MOUNTAIN RESEARCH AND DEVELOPMENT, 2006, 26 (02) : 109 - 114