Single-machine scheduling with decreasing time-dependent processing times to minimize total absolute differences in waiting times

被引:2
|
作者
Wang, Dan [1 ]
Wu, Yu-Bin [2 ]
Wang, Ji-Bo [2 ]
Ji, Ping [3 ]
机构
[1] Shenyang Aerosp Univ, Sch Comp, Shenyang 110136, Liaoning, Peoples R China
[2] Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Liaoning, Peoples R China
[3] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Kowloon, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
scheduling; single-machine; time-dependent processing times; total absolute differences in waiting times;
D O I
10.1080/10170669.2012.721211
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this article we consider a single-machine scheduling problem with decreasing time-dependent jobprocessing times. Decreasing time-dependent job-processing times means that its processing time is a non-increasing function of its execution start time. The objective is to find a schedule that minimizes total absolute differences in waiting times. We show that the optimal schedule is V-shaped: jobs are arranged in the descending order of their normal processing times if they are placed before the job with the smallest normal processing time, but in the ascending order of their normal processing times if placed after it. We prove several other properties of an optimal schedule, and introduce two heuristic algorithms that are tested against a lower bound. We also provide computational results to evaluate the performance of the heuristic algorithms.
引用
收藏
页码:444 / 453
页数:10
相关论文
共 50 条
  • [1] Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs
    Sun, L-H
    Sun, L-Y
    Wang, J-B
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (04) : 768 - 775
  • [2] A note on single-machine scheduling with decreasing time-dependent job processing times
    Wang, Ji-Bo
    [J]. APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 294 - 300
  • [3] Single-machine group scheduling with linearly decreasing time-dependent setup times and job processing times
    Wang, Ji-Bo
    Sun, Linyan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 765 - 772
  • [4] Single-machine group scheduling with linearly decreasing time-dependent setup times and job processing times
    Ji-Bo Wang
    Linyan Sun
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 765 - 772
  • [5] Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Times
    Kung, Jan-Yee
    Chao, Yuan-Po
    Lee, Kuei-I
    Kang, Chao-Chung
    Lin, Win-Chin
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [6] Single-Machine Time-Dependent Scheduling with Proportional and Delivery Times
    Miao, Cuixia
    Song, Jiaxin
    Zhang, Yuzhong
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (04)
  • [7] Single-machine scheduling with precedence constraints and decreasing start-time dependent processing times
    Gao, Wen-Jun
    Huang, Xue
    Wang, Ji-Bo
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (1-4): : 291 - 299
  • [8] Single-machine scheduling with precedence constraints and decreasing start-time dependent processing times
    Wen-Jun Gao
    Xue Huang
    Ji-Bo Wang
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 46 : 291 - 299
  • [9] SINGLE-MACHINE SCHEDULING WITH START TIME-DEPENDENT PROCESSING TIMES - SOME SOLVABLE CASES
    SUNDARARAGHAVAN, PS
    KUNNATHUR, AS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (03) : 394 - 403
  • [10] Single-machine scheduling with time-and-resource-dependent processing times
    Wei, Cai-Min
    Wang, Ji-Bo
    Ji, Ping
    [J]. APPLIED MATHEMATICAL MODELLING, 2012, 36 (02) : 792 - 798