Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs

被引:19
|
作者
Sun, L-H [1 ,2 ,3 ]
Sun, L-Y [3 ,4 ,5 ]
Wang, J-B [2 ,6 ]
机构
[1] Xian Univ Technol, Sch Business Adm, Xian, Peoples R China
[2] Xi An Jiao Tong Univ, Knowledge Management & Innovat Res Ctr, Xian 710049, Peoples R China
[3] Xi An Jiao Tong Univ, State Key Lab Mech Mfg, Xian 710049, Peoples R China
[4] Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
[5] Xi An Jiao Tong Univ, Minist Educ Proc Control & Efficiency, Key Lab, Xian 710049, Peoples R China
[6] Shenyang Inst Aeronaut Engn, Sch Sci, Operat Res & Cybernet Inst, Shenyang 110136, Peoples R China
关键词
scheduling; single machine; deteriorating jobs; total absolute differences in waiting times; heuristic algorithm; SIMPLE LINEAR DETERIORATION; DEPENDENT PROCESSING TIMES; TOTAL COMPLETION-TIME; DUE-DATE ASSIGNMENT; FLOW-SHOP; DOMINATING MACHINES; PARALLEL-MACHINE;
D O I
10.1057/jors.2010.26
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we consider a single-machine scheduling problem with simple linear deterioration. By simple linear deterioration, we mean that the processing time of a job is a simple linear function of its execution starting time and its deterioration rate. The objective is to find a schedule that minimizes total absolute differences in waiting times. We show that the optimal schedule is V-shaped: jobs are arranged in descending order of their deterioration rates if they are placed before the job with the smallest deterioration rate, but in ascending order of their deterioration rates if placed after it. We prove other several properties of an optimal schedule, and introduce two efficient heuristic algorithms that are tested against a lower bound. We also provide computational results to evaluate the performance of the heuristic algorithms. Journal of the Operational Research Society (2011) 62, 768-775. doi:10.1057/jors.2010.26 Published online 28 April 2010
引用
收藏
页码:768 / 775
页数:8
相关论文
共 50 条
  • [1] Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times
    Li, Yongqiang
    Li, Gang
    Sun, Linyan
    Xu, Zhiyong
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (02) : 424 - 429
  • [2] Single-Machine Scheduling to Minimize Absolute Value in Maximum Lateness with Deteriorating Jobs
    Wang, Ji-Bo
    Yang, Dar-Li
    Hsu, Chou-Jung
    [J]. ADVANCED MANUFACTURING SYSTEMS, PTS 1-3, 2011, 201-203 : 1054 - +
  • [3] Single-machine scheduling with decreasing time-dependent processing times to minimize total absolute differences in waiting times
    Wang, Dan
    Wu, Yu-Bin
    Wang, Ji-Bo
    Ji, Ping
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2012, 29 (07) : 444 - 453
  • [4] Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Huang, Yi-Chi
    Lee, Wen-Chiung
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (12) : 1760 - 1765
  • [5] Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan
    Wang, Xiuli
    Cheng, T. C. Edwin
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (01) : 57 - 70
  • [6] A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties
    Xue Huang
    Ji-Bo Wang
    Xue-Ru Wang
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 47 : 1225 - 1230
  • [7] A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties
    Huang, Xue
    Wang, Ji-Bo
    Wang, Xue-Ru
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (9-12): : 1225 - 1230
  • [8] Single-machine scheduling with deteriorating jobs
    Kuo, Wen-Hung
    Yang, Dar-Li
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (01) : 132 - 139
  • [9] Scheduling deteriorating jobs on a single machine to minimize the maximum processing times
    Alidaee, B
    Landram, F
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1996, 27 (05) : 507 - 510
  • [10] A note on single-machine scheduling with deteriorating jobs
    Yin, Yunqiang
    Yuan, Fenglian
    [J]. ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 483 - 486