共 50 条
- [41] Production control of an unreliable manufacturing system under the assumption of no backlog [J]. Mathematical Methods of Operations Research, 1997, 46 : 103 - 117
- [46] Perturbation Analysis for Optimal Production Planning Of a Manufacturing System with Subcontracting and Machine Degradation [J]. IFAC PAPERSONLINE, 2015, 48 (03): : 2145 - 2152