共 50 条
- [31] THERMAL CALCULATION OF BLAST-FURNACE HOT-BLAST STOVES OPERATING UNDER DIFFERENT REGIMES .2. STEEL IN THE USSR, 1982, 12 (02): : 78 - 79
- [32] OPTIMIZING THERMAL WORKING OF BLAST-FURNACE HOT-BLAST STOVES DURING HEATING WITH THERMAL AND TECHNOLOGICAL LIMITATIONS STEEL IN THE USSR, 1977, 7 (04): : 202 - 203
- [33] Measurement of the temperature drop in blast-furnace hot-blast mains TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1915, 53 : 373 - 382
- [34] WAYS OF IMPROVING AERODYNAMICS OF BLAST-FURNACE HOT BLAST STOVES STEEL IN THE USSR, 1988, 18 (09): : 392 - 393
- [35] OPTIMIZING RUNNING PERIOD OF BLAST-FURNACE HOT BLAST STOVES STEEL IN THE USSR, 1983, 13 (08): : 370 - 372
- [36] BLAST-FURNACE HOT-BLAST STOVE WITH A CENTRAL COMBUSTION-CHAMBER AND DISTRIBUTED DELIVERY OF BLAST AND REMOVAL OF COMBUSTION PRODUCTS STEEL IN THE USSR, 1976, 6 (07): : 360 - 360
- [37] DIGITAL MODEL OF HOT-BLAST STOVE ASSEMBLY OF A BLAST-FURNACE STEEL IN THE USSR, 1973, 3 (05): : 353 - 355
- [38] COOLING BLAST-FURNACE HOT-BLAST STOVE BEFORE REPAIRS STEEL IN THE USSR, 1982, 12 (12): : 543 - 544
- [40] The reactive projection repair (RPR) on the blast furnace hot-blast stoves (cowpers) REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2000, 97 (04): : 507 - +