CONSTRUCTION DELAY CLAIMS

被引:0
|
作者
COPLAN, N [1 ]
机构
[1] AMER INST ARCHITECTS, WASHINGTON, DC 20006 USA
来源
PROGRESSIVE ARCHITECTURE | 1983年 / 64卷 / 09期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:221 / 221
页数:1
相关论文
共 50 条
  • [31] Construction claims based on FIDIC
    Liu, RH
    Yang, XD
    Wang, JJ
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 321 - 324
  • [32] SHIP CONSTRUCTION CLAIMS IN ADMIRALTY
    Cremean, Damien J.
    AUSTRALIAN LAW JOURNAL, 2021, 95 (01): : 13 - 17
  • [33] PREVENTION AND RESOLUTION OF CONSTRUCTION CLAIMS
    WILSON, RL
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1982, 108 (03): : 390 - 405
  • [34] CONSTRUCTION CLAIMS - FREQUENCY AND SEVERITY
    DIEKMANN, JE
    NELSON, MC
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (01): : 74 - 81
  • [35] Can construction claims be avoided?
    1600, Publ by Canadian Soc for Civil Engineering, Montreal, Que, Can (2 pt 1):
  • [36] AVOIDING LITIGATION AND CONSTRUCTION CLAIMS
    GREENBERG, G
    PUBLIC WORKS, 1985, 116 (01): : 75 - 76
  • [37] Correlation and Causation in Construction Claims
    Zhao, Tong
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [38] CONSTRUCTION CLAIMS - LITIGATE OR ELIMINATE
    GOLDBLOOM, J
    CONSULTING ENGINEER, 1984, 63 (03): : 53 - 54
  • [39] Impossibility claims in construction projects
    Wong, YM
    Yiu, TW
    Cheung, SO
    Suen, CH
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 403 - 408
  • [40] FORMULA FOR OVERHEAD COSTS IN DELAY CLAIMS
    COPLAN, N
    PROGRESSIVE ARCHITECTURE, 1979, 60 (08): : 105 - 105