共 50 条
- [31] USE OF ADVANCED FUEL-CYCLES IN CANDU POWER-PLANT OPTIMIZATION 10TH ANNUAL CONFERENCE 1989 - CANADIAN NUCLEAR SOCIETY, PROCEEDINGS, VOL 2, 1989, : A6 - A9
- [32] POWER-PLANT OPERATING ALTERNATIVES FOR IMPROVING AND EXTENDING RESERVOIR PERFORMANCE AT THE GEYSERS GEYSERS - THREE DECADES OF ACHIEVEMENT : A WINDOW ON THE FUTURE, 1989, 13 : 581 - 588
- [34] CREEP CRACK-GROWTH BEHAVIOR IN POWER-PLANT BOILER AND STEAM PIPE STEELS JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 1988, 110 (02): : 137 - 146
- [36] THERMAL-ANALYSIS OF A SOLAR POND POWER-PLANT OPERATED WITH A DIRECT CONTACT BOILER JOURNAL OF SOLAR ENERGY ENGINEERING-TRANSACTIONS OF THE ASME, 1982, 104 (03): : 262 - 269
- [38] PRELIMINARY EXPERIENCE WITH NOX REDUCTION AT THE SANDREUTH THERMAL POWER-PLANT BRENNSTOFF-WARME-KRAFT, 1987, 39 (10): : R30 - R34
- [39] VSTOL POWER-PLANT CONTROL LESSONS FROM HARRIER EXPERIENCE NINTH INTERNATIONAL SYMPOSIUM ON AIR BREATHING ENGINES, VOLS 1 AND 2: SYMPOSIUM PAPERS, 1989, : 782 - 789
- [40] OPERATING EXPERIENCE WITH POWER PLANT STACKS AND THEIR DESIGN COMBUSTION, 1969, 41 (04): : 29 - &