共 50 条
- [31] THE EXECUTIVE GUIDE TO SUCCESSFUL MRP-II - WIGHT,O [J]. INDUSTRIAL MARKETING MANAGEMENT, 1983, 12 (02) : 151 - 152
- [32] GETTING INDUSTRIAL-ENGINEERS INVOLVED WITH MRP-II [J]. INDUSTRIAL ENGINEERING, 1984, 16 (10): : 49 - 49
- [33] MRP-II IMPLEMENTATIONS REAP STRATEGIC AND TACTICAL BENEFITS [J]. INDUSTRIAL ENGINEERING, 1991, 23 (03): : 46 - 48
- [35] MAKING THE MRP-II DECISION IS TOUGH - BUT WORTH THE EFFORT [J]. INDUSTRIAL ENGINEERING, 1991, 23 (03): : 58 - 59
- [36] APPLYING LEARNING-CURVE THEORY TO MRP-II [J]. APICS 32ND INTERNATIONAL CONFERENCE PROCEEDINGS : SOLUTIONS FOR PROGRESS, 1989, : 535 - 537
- [37] REENGINEERING THE MRP-II ENVIRONMENT - THE KEY IS SUCCESSFULLY IMPLEMENTING CHANGE [J]. IIE SOLUTIONS, 1995, 27 (07): : 24 - 27
- [39] IMPLEMENTING JIT WITH MRP-II CREATES HYBRID MANUFACTURING ENVIRONMENT [J]. INDUSTRIAL ENGINEERING, 1988, 20 (09): : 49 - 53
- [40] THE LAST WORD IN MRP-II - A SYSTEM INTERFACE USING SPEECH [J]. APICS 32ND INTERNATIONAL CONFERENCE PROCEEDINGS : SOLUTIONS FOR PROGRESS, 1989, : 418 - 421