Reliability-based life-cycle cost seismic design optimization of coastal bridge piers with nonuniform corrosion using different materials

被引:0
|
作者
Wu Xiangtong [1 ,2 ]
Yuan Wenting [3 ]
Guo Anxin [1 ,2 ]
机构
[1] Key Lab of Smart Prevention and Mitigation of Civil Engineering Disasters of the Ministry of Industry and Information Technology, Harbin Institute of Technology
[2] Key Lab of Structures Dynamic Behavior and Control of the Ministry of Education, Harbin Institute of Technology
[3] Institute of Transportation, Inner Mongolia University
基金
中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
U443.22 [桥墩];
学科分类号
摘要
Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC) structures.Limited research has been performed to investigate the life-cycle cost(LCC) of coastal bridge piers with nonuniform corrosion using different materials. In this study, a reliability-based design optimization(RBDO) procedure is improved for the design of coastal bridge piers using six groups of commonly used materials, i.e., normal performance concrete(NPC) with black steel(BS) rebar, high strength steel(HSS) rebar, epoxy coated(EC) rebar, and stainless steel(SS) rebar(named NPC-BS,NPC-HSS, NPC-EC, and NPC-SS, respectively), NPC with BS with silane soakage on the pier surface(named NPC-Silane),and high-performance concrete(HPC) with BS rebar(named HPC-BS). First, the RBDO procedure is improved for the design optimization of coastal bridge piers, and a bridge is selected to illustrate the procedure. Then, reliability analysis of the pier designed with each group of materials is carried out to obtain the time-dependent reliability in terms of the ultimate and serviceability performances. Next, the repair time of the pier is predicted based on the time-dependent reliability indices.Finally, the time-dependent LCCs for the pier are obtained for the selection of the optimal design.
引用
收藏
页码:209 / 225
页数:17
相关论文
共 50 条
  • [21] A Proof-of-Concept of a Reliability-Based Life-Cycle Cost Optimization Framework for Activated Sludge Processes
    Borobio-Castillo, R. A.
    Cabrera-Miranda, J. M.
    Corona-Vasquez, B.
    AIR SOIL AND WATER RESEARCH, 2023, 16
  • [22] Seismic performance design of concrete buildings with life-cycle cost optimization
    Zou, Xiao-Kang
    Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 768 - 774
  • [23] Advances in life-cycle reliability-based technology for design and maintenance of structural systems
    Frangopol, DM
    COMPUTATIONAL MECHANICS FOR THE TWENTY-FIRST CENTURY, 2000, : 311 - 328
  • [24] LIFE-CYCLE COST BASED DETERIORATING BRIDGE OPTIMUM DESIGN METHOD
    Peng, Jian-Xin
    Shao, Xu-Dong
    Zhang, Jian-Ren
    Yan, Dong-Huang
    4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 282 - 287
  • [25] Preference-based Multi-objective Optimization Model for Life-cycle Seismic Design of Bridge
    Li, Yu-Jing
    Li, Hong-Nan
    Li, Chao
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2017, 30 (12): : 187 - 195
  • [26] Life-Cycle System Reliability-Based Approach for Bridge Pile Foundations under Scour Conditions
    Wu, Zhongyang
    Luo, Zhe
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (02) : 412 - 423
  • [27] Life-Cycle System Reliability-Based Approach for Bridge Pile Foundations under Scour Conditions
    Zhongyang Wu
    Zhe Luo
    KSCE Journal of Civil Engineering, 2020, 24 : 412 - 423
  • [28] A metamodeling based seismic life-cycle cost assessment framework for highway bridge structures
    Shekhar, Shivang
    Ghosh, Jayadipta
    Reliability Engineering and System Safety, 2020, 195
  • [29] A metamodeling based seismic life-cycle cost assessment framework for highway bridge structures
    Shekhar, Shivang
    Ghosh, Jayadipta
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 195
  • [30] Life-cycle prediction of steel bridges using reliability-based fatigue deterioration profile: Case study of neka bridge
    Sahrapeyma, Ali
    Hosseini, Abdollah
    Marefat, Mohammad. -S.
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2013, 13 (02) : 229 - 242