Advanced Stability Analysis of the Tunnels in Jointed Rock Mass Based on TSP and DEM

被引:0
|
作者
Hongyun Fan
Liping Li
Hongliang Liu
Shaoshuai Shi
Jie Hu
Shen Zhou
机构
[1] Shandong University,School of Qilu Transportation
[2] Shandong University,Geotechnical and Structural Engineering Research Center
[3] Shandong University,Candidate School of Civil Engineering
来源
关键词
TSP; DEM; Jointed rock mass; Numerical calculation; 3DEC;
D O I
暂无
中图分类号
学科分类号
摘要
The discrete element method (DEM) can analyze the large deformation and large displacement of rock mass effectively, and it is widely used in underground engineering, slope engineering and other fields. However, due to the low accuracy of rock mass structural surface information acquisition, the application of discrete element method in the analysis of jointed rock mass stability is still deviated. In this paper, combined with the advantages of the tunnel seismic prediction (TSP) in obtaining discontinuous geological interface information and the discrete element method in the calculation and analysis of jointed rock mass stability, this paper proposes an advanced analysis method for jointed rock mass stability based on TSP and DEM. Compared to the traditional methods, the analysis results of the jointed rock mass stability are more reliable. Firstly, relying on the advanced detection system — Tunnel Seismic Prediction 203Plus, the unstructured rock mass structure information of the tunnel is obtained, and the spatial attitude of the discontinuous geological interface is further determined. Secondly, based on the Fish programming language, the non-continuous geological interface information can be expressed in the discrete unit software — 3D Distinct Element Code (3DEC). In this way, the excavation calculation model of the tunnels in jointed rock mass can be constructed. Finally, based on the DEM, the excavation of the tunnels in jointed rock mass can be simulated, analyze the stability of surrounding rock during the tunnel excavation process, and realize the stability analysis of surrounding rock stability of jointed rock mass. Based on the Huangjiazhuang Tunnel Project, this paper uses the above method to carry out on-site application. The results show that the location of the dangerous block is predicted to be consistent with the actual exposure of the tunnel surrounding rock based on TSP and DEM, which verify the accuracy and feasibility of this method, and the research results have practical guiding significance for the safe construction of the tunnels in jointed rock mass.
引用
收藏
页码:1491 / 1503
页数:12
相关论文
共 50 条
  • [31] Stability Analysis of Jointed Rock Cutting Slope Based on Discrete Element Method
    Zhu, Wei
    Gao, Liang
    Zhao, Yingai
    Yang, Chao
    Sun, Wei
    Yu, Pengqiang
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [32] Stability analysis of jointed rock slope by strength reduction method based on UDEC
    Lei Yuan-jian
    Wang Shui-lin
    ROCK AND SOIL MECHANICS, 2006, 27 (10) : 1693 - 1698
  • [33] Seismic stability analysis of bidirectional jointed rock slope
    Fu, Haiying
    Zhao, Yanyan
    Zhou, Mingzhe
    Li, Qilin
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2025, 84 (04)
  • [34] Stability analysis of intermittently jointed rock slopes based on the stepped failure mode
    LI Dejian
    FU Junwen
    LI Hekai
    CHENG Xiao
    ZHAO Lianheng
    ZHANG Yingbin
    PENG Xinyan
    Journal of Mountain Science, 2024, 21 (03) : 1019 - 1035
  • [35] Stability Analysis of Jointed Rock Slopes Based on the Universal Elliptical Disc Model
    Jiang, Shui-Hua
    Chen, Jia-Dong
    Huang, Jinsong
    GEOSHANGHAI 2024 INTERNATIONAL CONFERENCE, VOL 2, 2024, 1331
  • [36] Study on the dynamic failure of jointed rock mass due to transient unloading via DEM
    Wang, Hua-Ning
    Wang, Hao-Miao
    Song, Fei
    Bo, Ying-Jun
    Jiang, Ming-Jing
    KSCE JOURNAL OF CIVIL ENGINEERING, 2025, 29 (02)
  • [37] Stability analysis of intermittently jointed rock slopes based on the stepped failure mode
    Li, Dejian
    Fu, Junwen
    Li, Hekai
    Cheng, Xiao
    Zhao, Lianheng
    Zhang, Yingbin
    Peng, Xinyan
    JOURNAL OF MOUNTAIN SCIENCE, 2024, 21 (03) : 1019 - 1035
  • [38] Cracking mechanism of deep jointed rock mass induced by transient excavation via DEM
    Bo Y.-J.
    Wang H.-N.
    Jiang M.-J.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2020, 42 : 196 - 201
  • [39] A COMPUTER METHOD FOR STABILITY ANALYSIS OF CAVERNS IN JOINTED ROCK
    BELYTSCHKO, T
    PLESHA, M
    DOWDING, CH
    INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 1984, 8 (05) : 473 - 492
  • [40] Uncertainty analysis of mechanical behavior of jointed rock mass
    Zhang Cui-lian
    ROCK AND SOIL MECHANICS, 2016, 37 (09) : 2721 - 2727