共 45 条
- [22] Analyzing closed Kanban-controlled assembly systems by iterative aggregation-disaggregation Comp. Oper. Res., 10-11 (1015-1039):
- [24] Scheduling flowshops with condition-based maintenance constraint to minimize expected makespan INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 757 - 767
- [25] Scheduling flowshops with condition-based maintenance constraint to minimize expected makespan The International Journal of Advanced Manufacturing Technology, 2010, 46 : 757 - 767
- [29] Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1186 - 1198
- [30] Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1186 - 1198