Time Series Analysis Framework for Forecasting the Construction Labor Costs

被引:0
|
作者
Sayed Amir Mohsen Faghih
Yaghob Gholipour
Hamed Kashani
机构
[1] University of Tehran,School of Civil Engineering, College of Engineering
[2] Sharif University of Technology,Dept. of Civil Engineering
来源
关键词
Labor cost; Average hourly earnings; Vector error correction; Project cost estimation; Labor cost forecasting;
D O I
暂无
中图分类号
学科分类号
摘要
This manuscript presents a framework to develop vector error correction (VEC) models applicable to forecasting the short- and long-run movements of the average hourly earnings of construction labor, which is an essential predictor of the construction labor costs. These models characterize the relationship between average hourly earnings and a set of explanatory variables. The framework is applied to develop VEC forecasting models for the average hourly earnings of construction labor in the USA based on the identified variables that govern its movements, such as Global Energy Price Index, Gross Domestic Product, and Personal Consumption Expenditures. More than 150 candidate VEC models were created, of which 25 passed the diagnostics. The most appropriate model was then identified by comparing the prediction performance of these models when applied to the forecasting average hourly earnings over 36-months. The proposed framework and the ensuing models address the need for appropriate models that can forecast the short- and long-run movements of the labor costs. Practitioners can use the proposed framework to develop much-needed forecast models and estimate construction labor costs of the various projects. The insights derived from the development and applications of these models can enhance the chances of project success.
引用
收藏
页码:2809 / 2823
页数:14
相关论文
共 50 条
  • [41] Costs of order selection in time series analysis
    Broersen, PMT
    de Waele, S
    IMTC 2002: PROCEEDINGS OF THE 19TH IEEE INSTRUMENTATION AND MEASUREMENT TECHNOLOGY CONFERENCE, VOLS 1 & 2, 2002, : 303 - 308
  • [42] A Framework for Time-Series Analysis
    Kurbalija, Vladimir
    Radovanovic, Milos
    Geler, Zoltan
    Ivanovic, Mirjana
    ARTIFICIAL INTELLIGENCE: METHODOLOGY, SYSTEMS, AND APPLICATIONS, AIMSA 2010, 2010, 6304 : 42 - 51
  • [43] Pipeline Construction Cost Forecasting Using Multivariate Time Series Methods
    Kim, Sooin
    Abediniangerabi, Bahram
    Shahandashti, Mohsen
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2021, 12 (03)
  • [44] Forecasting tunnel geology, construction time and costs using machine learning methods
    Arsalan Mahmoodzadeh
    Mokhtar Mohammadi
    Ako Daraei
    Hunar Farid Hama Ali
    Abdulqadir Ismail Abdullah
    Nawzad Kameran Al-Salihi
    Neural Computing and Applications, 2021, 33 : 321 - 348
  • [45] ESTIMATION AND CONTROL OF CONSTRUCTION LABOR COSTS
    PAULSON, BC
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (03): : 623 - 633
  • [46] Forecasting Construction Cost Index Using Interrupted Time-Series
    Moon, Taenam
    Shin, Do Hyoung
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (05) : 1626 - 1633
  • [47] Time Series Visualization and Forecasting from Australian Building and Construction Statistics
    Zhang, Wei Emma
    Chang, Ruidong
    Zhu, Minhao
    Zuo, Jian
    APPLIED SCIENCES-BASEL, 2022, 12 (05):
  • [48] Forecasting tunnel geology, construction time and costs using machine learning methods
    Mahmoodzadeh, Arsalan
    Mohammadi, Mokhtar
    Daraei, Ako
    Ali, Hunar Farid Hama
    Abdullah, Abdulqadir Ismail
    Al-Salihi, Nawzad Kameran
    NEURAL COMPUTING & APPLICATIONS, 2021, 33 (01): : 321 - 348
  • [49] Forecasting Construction Cost Index Using Interrupted Time-Series
    Taenam Moon
    Do Hyoung Shin
    KSCE Journal of Civil Engineering, 2018, 22 : 1626 - 1633
  • [50] Automated Time-Series Cost Forecasting System for Construction Materials
    Hwang, Sungjoo
    Park, Moonseo
    Lee, Hyun-Soo
    Kim, Hyunsoo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (11) : 1259 - 1269