Economic assessment and ranking of wind power potential using fuzzy-TOPSIS approach

被引:0
|
作者
Muhammad Mohsin
Jijian Zhang
Rahman Saidur
Huaping Sun
Sadiq Mohammed Sait
机构
[1] Jiangsu University,School of Finance and Economics
[2] Shaheed Benazir Bhutto University,School of Business Administration
[3] Sunway University,Research Centre for Nano
[4] King Fahd University of Petroleum & Minerals,Materials and Energy Technology (RCNMET), School of Science and Technology
[5] CCITR-RI,CoRE
[6] King Fahd University of Petroleum & Minerals,RE, Research Institute
关键词
Renewable energy; Economic assessment; Fuzzy-TOPSIS; Wind power potential; Weibull distribution; Power law;
D O I
暂无
中图分类号
学科分类号
摘要
In this study, we proposed integrated tools to evaluate the wind power potential, economic viability, and prioritize 15 proposed sites for the installation of wind farms. Initially, we used modified Weibull distribution model coupled with power law to assess the wind power potential. Secondly, we employed value cost method to estimate per unit cost ($/kWh) of proposed sites. Lastly, we used Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (F-TOPSIS) to rank the best alternatives. The results indicate that Pakistan has enormous wind power potential that cost varies from 0.06 $/kWh to 0.58 $/kWh; thus, sites S12, S13, S14, and S15 are considered as the most economic viable locations for the installation of wind power project, while remaining sites are considered to be less important, due to other complexities. The further analysis using Fuzzy-TOPSIS method reveals that site S13 is the most optimal location followed by S12, S14, and S14 for the development of wind power project. We proposed that government should formulate wind power policy for the implementation of wind power projects in order to meet energy demand of the country.
引用
收藏
页码:22494 / 22511
页数:17
相关论文
共 50 条
  • [1] Economic assessment and ranking of wind power potential using fuzzy-TOPSIS approach
    Mohsin, Muhammad
    Zhang, Jijian
    Saidur, Rahman
    Sun, Huaping
    Sait, Sadiq Mohammed
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2019, 26 (22) : 22494 - 22511
  • [2] Power Plant Project Risk Assessment Using a Fuzzy-ANP and Fuzzy-TOPSIS Method
    Zegordi, S. H.
    Nik, E. Rezaee
    Nazari, A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2012, 25 (02): : 107 - 120
  • [3] Siliceous Concrete Materials Management for Sustainability Using Fuzzy-TOPSIS Approach
    Falqi, Ibrahim I.
    Ahmed, Mohd
    Mallick, Javed
    APPLIED SCIENCES-BASEL, 2019, 9 (17):
  • [4] A cause-based defect ranking approach for existing concrete bridges using Analytic Hierarchy Process and fuzzy-TOPSIS
    Das Khan, Sudha
    Datta, Aloke Kumar
    Topdar, Pijush
    Sagi, Sitharama Raju
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2023, 19 (11) : 1555 - 1567
  • [5] Heat Transfer Enhancement Using Augmented Tubes for Desalination Using Fuzzy-TOPSIS Approach
    Kaushal, R.
    Kumar, R.
    RENEWABLE ENERGY RESEARCH AND APPLICATIONS, 2020, 1 (01): : 19 - 26
  • [6] Selection of Television Channels for Product Promotion: A Fuzzy-TOPSIS Approach
    Kaul, Arshia
    Aggarwal, Sugandha
    Jha, P. C.
    SOFT COMPUTING FOR PROBLEM SOLVING, SOCPROS 2018, VOL 1, 2020, 1048 : 621 - 628
  • [7] Ranking maintenance strategies for sustainable maintenance plan in manufacturing systems using fuzzy axiomatic design principle and fuzzy-TOPSIS
    Ighravwe, Desmond Eseoghene
    Oke, Sunday Ayoola
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2017, 28 (07) : 961 - 992
  • [8] Integrating Life Cycle Sustainability Assessment Results Using Fuzzy-TOPSIS in Automotive Lightweighting
    Zanchi, Laura
    Delogu, Massimo
    Dattilo, Caterina Antonia
    Zamagni, Alessandra
    Del Pero, Francesco
    SAE INTERNATIONAL JOURNAL OF MATERIALS AND MANUFACTURING, 2021, 14 (03) : 317 - 341
  • [9] An approach to maintenance sustainability level assessment integrated with Industry 4.0 technologies using Fuzzy-TOPSIS: A real case study
    Patalas-Maliszewska, J.
    Losyk, H.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2022, 17 (04): : 455 - 468
  • [10] PLANT TYPE SELECTION FOR RECLAMATION OF SARCHESHMEH COPPER MINE USING FUZZY-TOPSIS APPROACH
    Ebrahimabadi, Arash
    Alavi, Iraj
    ARCHIVES OF MINING SCIENCES, 2013, 58 (03) : 953 - 968