共 50 条
- [41] PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem Mathematical Methods of Operations Research, 2000, 52 : 467 - 488
- [44] Parallel-DEVS specification of Resource-Constrainted Project Scheduling Project with a variable demand of resources PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 136 - 142
- [48] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations Sebt, M. H. (sebt@aut.ac.ir), 1600, Iran University of Science and Technology (11):