Project portfolio selection based on synergy degree of composite system

被引:0
|
作者
LiBiao Bai
Hongliang Chen
Qi Gao
Wei Luo
机构
[1] Chang’an University,School of Economics and Management
[2] Northwestern Polytechnical University,School of Management
[3] Chang’an University,School of Civil Engineering
来源
Soft Computing | 2018年 / 22卷
关键词
Project portfolio selection; Composite system; Order parameter; Order degree; Synergy degree;
D O I
暂无
中图分类号
学科分类号
摘要
A synergistic perspective to selecting the right project portfolio is the key to realizing strategic organizational objectives. Based on the theory of the composite system, this paper identifies the factors that affect the science of project portfolio selection (PPS) and investigates the synergistic relationship among the organizational strategic objective subsystem, the project portfolio subsystem and the environment subsystem, which collectively constitute the composite system of project portfolio selection. Utilizing the concept of order parameters, an order parameter system is built for each subsystem to reflect the synergistic relationships in the composite system of PPS. The PPS model is constructed based on the degree of synergy in the composite system by describing the order degree of the subsystem and the synergy degree of the composite system, which helps to quantify the synergistic relationships among these subsystems. The effectiveness and feasibility of the proposed model are demonstrated and validated by a case study.
引用
收藏
页码:5535 / 5545
页数:10
相关论文
共 50 条
  • [41] An extended model for project portfolio selection with project divisibility and interdependency
    Xingmei Li
    Shu-Cherng Fang
    Xiaoling Guo
    Zhibin Deng
    Jianxun Qi
    Journal of Systems Science and Systems Engineering, 2016, 25 : 119 - 138
  • [42] An extended model for project portfolio selection with project divisibility and interdependency
    Li, Xingmei
    Fang, Shu-Cherng
    Guo, Xiaoling
    Deng, Zhibin
    Qi, Jianxun
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2016, 25 (01) : 119 - 138
  • [43] Managing Underperformance Risk in Project Portfolio Selection
    Hall, Nicholas G.
    Long, Daniel Zhuoyu
    Qi, Jin
    Sim, Melvyn
    OPERATIONS RESEARCH, 2015, 63 (03) : 660 - 675
  • [44] Project Portfolio Selection: From Past to Present
    Iamratanakul, Supachart
    Patanakul, Peerasit
    Milosevic, Dragan
    2008 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY, VOLS 1-3, 2008, : 287 - +
  • [45] Project portfolio selection with scheduling: an evolutionary approach
    Martinez-Vega, Daniel A.
    Cruz-Reyes, Laura
    Rangel, Nelson, V
    Gomez S, Claudia G.
    Sanchez S, Patricia
    Perez, Mercedes, V
    INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2019, 10 (01): : 25 - 31
  • [46] Multiobjective project portfolio selection with fuzzy constraints
    Perez, F.
    Gomez, T.
    ANNALS OF OPERATIONS RESEARCH, 2016, 245 (1-2) : 7 - 29
  • [47] Estimation of Downside Risks in Project Portfolio Selection
    Kettunen, Janne
    Salo, Ahti
    PRODUCTION AND OPERATIONS MANAGEMENT, 2017, 26 (10) : 1839 - 1853
  • [48] Project portfolio selection model, a realistic approach
    Urli, Bruno
    Terrien, Francois
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2010, 17 (06) : 809 - 826
  • [49] PROJECT PORTFOLIO SELECTION IN A COLOMBIAN HOLDING COMPANY
    Mican, Camilo
    Tereso, Anabela
    Fernandes, Gabriela
    Araujo, Madalena
    4TH INTERNATIONAL CONFERENCE ON PRODUCTION ECONOMICS AND PROJECT EVALUATION (ICOPEV 2018), 2018, : 135 - 140
  • [50] Hybrid framework for investment project portfolio selection
    Rebiasz, Bogdan
    Gawel, Bartlomiej
    Skalna, Iwona
    FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 1117 - 1122