共 50 条
- [41] No-wait flowshop scheduling problem to minimize the number of tardy jobs INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4): : 311 - 323
- [48] One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs Int J Prod Econ, 2 (213-219):
- [49] Scheduling jobs with stochastic processing times or due dates on a server to minimize the number of tardy jobs 2015 3RD INTERNATIONAL CONFERENCE ON MANUFACTURING ENGINEERING AND TECHNOLOGY FOR MANUFACTURING GROWTH (METMG 2015), 2015, : 16 - 21