Water resources management under dual uncertainties: a factorial fuzzy two-stage stochastic programming approach

被引:0
|
作者
Yang Zhou
Gordon Huang
Shuo Wang
Yuanyuan Zhai
Xiaying Xin
机构
[1] University of Regina,Faculty of Engineering
[2] University of Regina,Institute for Energy, Environment and Sustainable Communities
关键词
Water resources management; Uncertainty; Factorial analysis; Fuzzy vertex technique; Two-stage stochastic programming; Decision making;
D O I
暂无
中图分类号
学科分类号
摘要
In this study we propose a factorial fuzzy two-stage stochastic programming (FFTSP) approach to support water resources management under dual uncertainties. The dual uncertainties in terms of fuzziness in modeling parameters and variability of α-cut levels are taken into account. As different α-cut levels are assigned to each fuzzy parameter (instead of an identical α-cut level), the effects of α-cut levels on fuzzy parameters can be considered. Factorial analysis method is integrated with fuzzy vertex method to tackle the interactive effects of fuzzy parameters within a two-stage stochastic programming framework. The effects of the interactions among fuzzy parameters under various α-cut level combinations can be examined. The FFTSP approach is applied to a water resources management case to demonstrate its applicability. The results show that this approach can not only give various optimized solutions according to decision makers’ confidence levels but also provide in-depth analyses for the effects of fuzzy parameters and their interactions on the solutions. In addition, the results show that the effects of diverse α-cut combinations should not be disregarded because the results may differ under some specific α-cut combinations. The dual sequential factorial analyses embedded in the FFTSP approach guarantee most variations in a system can be analyzed. Therefore water managers are able to gain sufficient knowledge to make robust decisions under uncertainty.
引用
收藏
页码:795 / 811
页数:16
相关论文
共 50 条
  • [41] Application of the Two-Stage Stochastic Programming for Optimizing Chemical Production Planning under Uncertainties
    Li, Chu-Fu
    Zou, Lai-Xi
    Chen, Bing-Zhen
    He, Xiao-Rong
    Dong, Chun-Jian
    Huang, Guang-Lei
    Duan, Yong-Hong
    Xiao, Ying-Feng
    [J]. JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 2009, 42 (06) : 433 - 440
  • [42] An inexact two-stage stochastic programming model for water resources management in Nansihu Lake Basin, China
    Xie, Y. L.
    Huang, G. H.
    Li, W.
    Li, J. B.
    Li, Y. F.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2013, 127 : 188 - 205
  • [43] Interval-parameter Two-stage Stochastic Semi-infinite Programming: Application to Water Resources Management under Uncertainty
    P. Guo
    G. H. Huang
    L. He
    H. Zhu
    [J]. Water Resources Management, 2009, 23 : 1001 - 1023
  • [44] Interval-parameter Two-stage Stochastic Semi-infinite Programming: Application to Water Resources Management under Uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Zhu, H.
    [J]. WATER RESOURCES MANAGEMENT, 2009, 23 (05) : 1001 - 1023
  • [45] Two-stage Stochastic Programming Based Model Predictive Control Strategy for Microgrid Energy Management under Uncertainties
    Li, Zhongwen
    Zang, Chuanzhi
    Zeng, Peng
    Yu, Haibin
    Li, Hepeng
    [J]. 2016 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2016,
  • [46] Interval Two-Stage Stochastic Integer Programming for Urban Water Resource Management under Uncertainty
    Mo, Shuhong
    Duan, Haini
    Shen, Bing
    Wang, Dingbao
    [J]. JOURNAL OF COASTAL RESEARCH, 2015, : 160 - 165
  • [47] An inexact fuzzy parameter two-stage stochastic programming model for irrigation water allocation under uncertainty
    Li, M.
    Guo, P.
    Fang, S. Q.
    Zhang, L. D.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2013, 27 (06) : 1441 - 1452
  • [48] Factorial fuzzy programming for planning water resources management systems
    Zhou, Yang
    Huang, Gordon
    Wang, Shuo
    Li, Zhong
    Zhou, Ya
    [J]. JOURNAL OF ENVIRONMENTAL PLANNING AND MANAGEMENT, 2016, 59 (10) : 1855 - 1872
  • [49] An inexact fuzzy parameter two-stage stochastic programming model for irrigation water allocation under uncertainty
    M. Li
    P. Guo
    S. Q. Fang
    L. D. Zhang
    [J]. Stochastic Environmental Research and Risk Assessment, 2013, 27 : 1441 - 1452
  • [50] Inexact Two-Stage Stochastic Robust Optimization Model for Water Resources Management Under Uncertainty
    Xu, Ye
    Huang, Guohe
    Qin, Xiaosheng
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2009, 26 (12) : 1765 - 1776