Experimental study on a centrifugal pump with an open impeller during startup period

被引:0
|
作者
Yuliang Zhang
Zuchao Zhu
Yingzi Jin
Baoling Cui
Yi Li
Huashu Dou
机构
[1] Zhejiang University,The State Key Lab of Fluid Power Transmission and Control
[2] Zhejiang Sci-Tech University,The Province Key Lab of Fluid Transmission Technology
来源
关键词
centrifugal pump; open impeller; startup; experimental study; transient behavior;
D O I
暂无
中图分类号
学科分类号
摘要
Transient performance of fluid machinery during transient operating periods, such as startup and stopping, has been drawn more attentions recently due to the growing engineering needs. In this paper, the transient behavior of a prototype centrifugal pump with an open impeller during rapid startup period is studied experimentally. The variations of the rotational speed, flow rate, head, and shaft power during rapid startup period are recorded in experiments at different discharge valve openings. In addition, the non-dimensional flow rate and head are also used to analyze the transient behavior. The research result shows that the rise characteristic of the rotational speed is not basically changed by working points, while mainly depends on the startup characteristics of the driving motor. Compared with the rapid rise of the rotational speed, the flow rate rises slowly in the initial stage of startup. Moreover, the flow rate lags behind the rotational speed to rise to final stable value, and the delay becomes more severe with the increase of the discharge valve opening. The shaft power impact phenomenon generally exists in the process of startup. The non-dimensional analysis shows that the non-dimensional head is very high at the very beginning of startup, and quickly falls to the minimum, then gradually rises to final stable value, while the non-dimensional flow rate always shows the rise tendency during whole startup period. In conclusion, it is found from the non-dimensional results that the quasi-steady analysis is unable to accurately assess the transient flow during startup period.
引用
收藏
页码:1 / 6
页数:5
相关论文
共 50 条
  • [1] Experimental Study on a Centrifugal Pump with an Open Impeller during Startup Period
    Zhang, Yuliang
    Zhu, Zuchao
    Jin, Yingzi
    Cui, Baoling
    Li, Yi
    Dou, Huashu
    JOURNAL OF THERMAL SCIENCE, 2013, 22 (01) : 1 - 6
  • [2] Experimental Study on a Centrifugal Pump with an Open Impeller during Startup Period
    Yuliang Zhang
    Zuchao Zhu
    Yingzi Jin
    Baoling Cui
    Yi Li
    Huashu Dou
    JournalofThermalScience, 2013, 22 (01) : 1 - 6
  • [3] Erratum to: Experimental study on a centrifugal pump with an open impeller during startup period
    Yuliang Zhang
    Zuchao Zhu
    Yingzi Jin
    Baoling Cui
    Yi Li
    Huashu Dou
    Journal of Thermal Science, 2013, 22 : 196 - 196
  • [4] Experimental Study on a Centrifugal Pump with an Open Impeller during Startup Period (vol 22, pg 1, 2013)
    Zhang, Yuliang
    Zhu, Zuchao
    Jin, Yingzi
    Cui, Baoling
    Li, Yi
    Dou, Huashu
    JOURNAL OF THERMAL SCIENCE, 2013, 22 (02) : 196 - 196
  • [5] Experimental Study on a Prototype Centrifugal Pump with Open Impeller During Stopping Period
    Zhang, Yu-Liang
    Zhu, Zu-Chao
    Sheng, Yi-Ni
    Cui, Bao-Ling
    Li, Yi
    INTERNATIONAL JOURNAL OF FLUID MECHANICS RESEARCH, 2016, 43 (01) : 18 - 27
  • [6] Experimental and Theoretical Study of a Prototype Centrifugal Pump during Startup Period
    Zhang, Yu-Liang
    Zhu, Zu-Chao
    Dou, Hua-Shu
    Cui, Bao-Ling
    Li, Yi
    INTERNATIONAL JOURNAL OF TURBO & JET-ENGINES, 2013, 30 (02) : 173 - 177
  • [7] Experimental study on performance of a prototype centrifugal pump during rapid startup period
    Zhang, Yu-Liang
    Zhu, Zu-Chao
    Cui, Bao-Ling
    Li, Yi
    Dou, Hua-Shu
    Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 2013, 34 (11): : 2056 - 2060
  • [8] STUDY OF TRANSIENT BEHAVIOR IN CENTRIFUGAL PUMP DURING STARTUP PERIOD
    Zhang Yu-liang
    Zhu Zu-chao
    Cui Bao-ling
    Li Yi
    PROCEEDINGS OF THE ASME FLUIDS ENGINEERING DIVISION SUMMER MEETING, 2012, VOL 1, PTS A AND B, SYMPOSIA, 2012, : 375 - 380
  • [9] Experimental investigation of external performance of prototype centrifugal pump during startup period
    Zhang, Yuliang
    Zhu, Zuchao
    Cui, Baoling
    Li, Yi
    Cui, B. (blcui7577@sina.com), 1600, Chinese Mechanical Engineering Society (49): : 147 - 152
  • [10] Study on the Transient Characteristics of the Centrifugal Pump during the Startup Period with Assisted Valve
    Li, Qiao
    Ma, Xiang
    Wu, Peng
    Yang, Shuai
    Huang, Bin
    Wu, Dazhuan
    PROCESSES, 2020, 8 (10) : 1 - 17