Sampling strategies and stopping criteria for stochastic dual dynamic programming: A case study in long-term hydrothermal scheduling

被引:91
|
作者
Homem-De-Mello T. [1 ]
De Matos V.L. [2 ]
Finardi E.C. [2 ]
机构
[1] Department of Mechanical and Industrial Engineering, University of Illinois at Chicago, Chicago, IL
[2] Lab Plan-Laboratório de Planejamento de Sistemas de Energia Elétrica, Universidade Federal de Santa Catarina, Florianopolis
关键词
Monte Carlo; Stochastic Program; Scenario Tree; Latin Hypercube Sampling; Forward Pass;
D O I
10.1007/s12667-011-0024-y
中图分类号
学科分类号
摘要
The long-term hydrothermal scheduling is one of the most important problems to be solved in the power systems area. This problem aims to obtain an optimal policy, under water (energy) resources uncertainty, for hydro and thermal plants over a multi-annual planning horizon. It is natural to model the problem as a multistage stochastic program, a class of models for which algorithms have been developed. The original stochastic process is represented by a finite scenario tree and, because of the large number of stages, a sampling-based method such as the Stochastic Dual Dynamic Programming (SDDP) algorithm is required. The purpose of this paper is two-fold. Firstly, we study the application of two alternative sampling strategies to the standard Monte Carlo-namely, Latin hypercube sampling and randomized quasi-Monte Carlo-for the generation of scenario trees, as well as for the sampling of scenarios that is part of the SDDP algorithm. Secondly, we discuss the formulation of stopping criteria for the optimization algorithm in terms of statistical hypothesis tests, which allows us to propose an alternative criterion that is more robust than that originally proposed for the SDDP. We test these ideas on a problem associated with the whole Brazilian power system, with a three-year planning horizon. © 2011 Springer-Verlag.
引用
收藏
页码:1 / 31
页数:30
相关论文
共 50 条
  • [21] Comparison of dynamic programming policies for long-term hydrothermal scheduling of single-reservoir systems in steady-state regime
    Costa, Thayze D'Martin
    Soares, Secundino
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2021, 196 (196)
  • [22] Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems
    Dias, Bruno Henriques
    Tomim, Marcelo Aroca
    Marques Marcato, Andre Luis
    Ramos, Tales Pulinho
    Brandi, Rafael Bruno S.
    da Silva Junior, Ivo Chaves
    Passos Filho, Joao Alberto
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (01) : 212 - 222
  • [23] A hybrid dynamic programming - Tabu Search approach for the long-term hydropower scheduling problem
    Yves Mbeutcha
    Michel Gendreau
    Gregory Emiel
    [J]. Computational Management Science, 2021, 18 : 385 - 410
  • [24] Ensemble of Markovian stochastic dynamic programming models in different time scales for long term hydropower scheduling
    Scarcelli, R. O. C.
    Zambelli, M. S.
    Soares, S.
    Carneiro, A. A. F. M.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2017, 150 : 129 - 136
  • [25] Linking genetic algorithms with stochastic dynamic programming to the long-term operation of a multireservoir system
    Huang, WC
    Yuan, LC
    Lee, CM
    [J]. WATER RESOURCES RESEARCH, 2002, 38 (12)
  • [26] A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments
    Amirkabir University of Technology, Tehran, Iran
    [J]. J S Afr Inst Min Metall, 2006, 2 (105-114):
  • [27] Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation
    Ramazan, S.
    Dimitrakopoulos, R.
    [J]. OREBODY MODELLING AND STRATEGIC MINE PLANNING: UNCERTAINTY AND RISK MANAGEMENT MODELS, 2005, (14): : 359 - 365
  • [28] A hybrid dynamic programming-Tabu Search approach for the long-term hydropower scheduling problem
    Mbeutcha, Yves
    Gendreau, Michel
    Emiel, Gregory
    [J]. COMPUTATIONAL MANAGEMENT SCIENCE, 2021, 18 (03) : 385 - 410
  • [29] A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments
    Golamnejad, J
    Osanloo, M
    Karimi, B
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2006, 106 (02) : 105 - 114
  • [30] A mathematical programming-based heuristic for coordinated hydrothermal generator maintenance scheduling and long-term unit commitment
    Zhang, Zihan
    Liu, Mingbo
    Xie, Min
    Dong, Ping
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 147