Production scheduling of prefabricated components considering delivery methods

被引:0
|
作者
Shuqiang Wang
Xi Zhang
机构
[1] Hubei University of Technology,School of Civil Engineering, Architecture and Environment
[2] Hubei University of Technology,Innovation Demonstration Base of Ecological Environment Geotechnical and Ecological Restoration of Rivers and Lakes
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
To address the processing scheduling problem involving multiple molds, components, and floors, we propose the Genetic Grey Wolf Optimizer (GGA) as a means to optimize the production scheduling of components in a production line. This approach combines the Grey Wolf algorithm with the genetic algorithm. Previous methods have overlooked the storage requirements arising from the delivery characteristics of prefabricated components, often resulting in unnecessary storage costs. Intelligent algorithms have been demonstrated to be effective in production scheduling, and thus, to enhance the efficiency of prefabricated component production scheduling, our study presents a model incorporating a production objective function. This model takes into account production resources and delivery characteristics constraints. Subsequently, we develop a hybrid algorithm, combining the grey wolf algorithm with the genetic algorithm, to search for the optimal solution with a minimal storage cost. We validate the model using a case study, and the experimental results demonstrate that GAGWO successfully identifies the best precast production schedule. Furthermore, the precast production plan, considering the delivery method, is found to be reasonable.
引用
收藏
相关论文
共 50 条
  • [1] Production scheduling of prefabricated components considering delivery methods
    Wang, Shuqiang
    Zhang, Xi
    [J]. SCIENTIFIC REPORTS, 2023, 13 (01)
  • [2] Dynamic Production Scheduling for Prefabricated Components Considering the Demand Fluctuation
    Du, Juan
    Dong, Peng
    Sugumaran, Vijayan
    [J]. INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2020, 26 (04): : 715 - 723
  • [3] Optimization of Production Scheduling for Prefabricated Components: Survey of Literature
    Chen, Wei
    Li, Xiaoxue
    Liu, Jie
    [J]. ICCREM 2021: CHALLENGES OF THE CONSTRUCTION INDUSTRY UNDER THE PANDEMIC, 2021, : 640 - 646
  • [4] Production scheduling of off-site prefabricated construction components considering sequence dependent due dates
    Yazdani, Maziar
    Kabirifar, Kamyar
    Fathollahi-Fard, Amir M.
    Mojtahedi, Mohammad
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021,
  • [5] Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm
    Chang, Chunguang
    Han, Mengyao
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [6] Scheduling optimization for production of prefabricated components with parallel work of serial machines
    Liu, Wenli
    Tao, Xingyu
    Mao, Chao
    He, Wenjian
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 148
  • [7] Joint optimization method of production scheduling for prefabricated components based on preventive maintenance
    Yu, Miao
    Li, Tingwei
    Ma, Jian
    [J]. 2022 41ST CHINESE CONTROL CONFERENCE (CCC), 2022, : 1940 - 1944
  • [8] Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components
    Du, Juan
    Xue, Yan
    Sugumaran, Vijayan
    Hu, Min
    Dong, Peng
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (04) : 1601 - 1635
  • [9] Prefabricated components for tunnel construction Production of tubbings
    Ockermüller, Georg
    [J]. Betonwerk und Fertigteil-Technik/Concrete Plant and Precast Technology, 2007, 73 (11): : 60 - 63
  • [10] Property-based assembled prefabricated components scheduling algorithm
    Qi R.
    Li J.-Q.
    [J]. Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (02): : 283 - 291