Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components

被引:18
|
作者
Du, Juan [1 ,2 ,3 ]
Xue, Yan [1 ]
Sugumaran, Vijayan [4 ]
Hu, Min [1 ,3 ]
Dong, Peng [1 ]
机构
[1] Shanghai Univ, SILC Business Sch, Shanghai, Peoples R China
[2] Univ Technol Sydney, Fac Engn & IT, Sydney, NSW, Australia
[3] Shanghai Engn Res Ctr Urban Infrastruct Renewal, Shanghai, Peoples R China
[4] Oakland Univ, Rochester, MI 48063 USA
关键词
Prefabricated component; Production scheduling; Biogeography-based optimization algorithm; Lean construction; OFF-SITE CONSTRUCTION; FLOW-SHOP; PRECAST; MANAGEMENT; TRANSPORTATION;
D O I
10.1108/ECAM-04-2021-0311
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose For prefabricated building construction, improper handling of the production scheduling for prefabricated components is one of the main reasons that affect project performance, which causes overspending, schedule overdue and quality issues. Prior research on prefabricated components production schedule has shown that optimizing the flow shop scheduling problem (FSSP) is the basis for solving this issue. However, some key resources and the behavior of the participants in the context of actual prefabricated components production are not considered comprehensively. Design/methodology/approach This paper characterizes the production scheduling of the prefabricated components problem into a permutation flow shop scheduling problem (PFSSP) with multi-optimization objectives, and limitation on mold and buffers size. The lean construction principles of value-based management (VBM) and just-in-time (JIT) are incorporated into the production process of precast components. Furthermore, this paper applies biogeography-based optimization (BBO) to the production scheduling problem of prefabricated components combined with some improvement measures. Findings This paper focuses on two specific scenarios: production planning and production rescheduling. In the production planning stage, based on the production factor, this study establishes a multi-constrained and multi-objective prefabricated component production scheduling mathematical model and uses the improved BBO for prefabricated component production scheduling. In the production rescheduling stage, the proposed model allows real-time production plan adjustments based on uncertain events. An actual case has been used to verify the effectiveness of the proposed model and the improved BBO. Research limitations/implications With respect to limitations, only linear weighted transformations are used for objective optimization. In regards to research implications, this paper considers the production of prefabricated components in an environment where all parties in the supply chain of prefabricated components participate to solve the production scheduling problem. In addition, this paper creatively applies the improved BBO to the production scheduling problem of prefabricated components. Compared to other algorithms, the results show that the improved BBO show optimized result. Practical implications The proposed approach helps prefabricated component manufacturers consider complex requirements which could be used to formulate a more scientific and reasonable production plan. The proposed plan could ensure the construction project schedule and balance the reasonable requirements of all parties. In addition, improving the ability of prefabricated component production enterprises to deal with uncertain events. According to actual production conditions (such as the occupation of mold resources and storage resources of completed components), prefabricated component manufacturers could adjust production plans to reduce the cost and improve the efficiency of the whole prefabricated construction project. Originality/value The value of this article is to provide details of the procedures and resource constraints from the perspective of the precast components supply chain, which is closer to the actual production process of prefabricated components. In addition, developing the production scheduling for lean production will be in line with the concept of sustainable development. The proposed lean production scheduling could establish relationships between prefabricated component factory manufacturers, transportation companies, on-site contractors and production workers to reduce the adverse effects of emergencies on the prefabricated component production process, and promote the smooth and efficient operation of construction projects.
引用
收藏
页码:1601 / 1635
页数:35
相关论文
共 50 条
  • [1] An Improved Biogeography-based Optimization Algorithm
    Xu, Yu-xuan
    Lei, De-ming
    [J]. 2018 CHINESE AUTOMATION CONGRESS (CAC), 2018, : 3722 - 3726
  • [2] An Improved Biogeography-Based Optimization Algorithm for Flow Shop Scheduling Problem
    Huang, Ming
    Shi, Shasha
    Liang, Xu
    Jiao, Xuan
    Fu, Yijie
    [J]. 2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, : 59 - 63
  • [3] An Improved Biogeography-Based Optimization Algorithm for Blocking Flow Shop Scheduling Problem
    Liu Shufen
    Wang Pengfei
    Zhang Jiachen
    [J]. CHINESE JOURNAL OF ELECTRONICS, 2018, 27 (02) : 351 - 358
  • [4] An Improved Biogeography-Based Optimization Algorithm for Blocking Flow Shop Scheduling Problem
    LIU Shufen
    WANG Pengfei
    ZHANG Jiachen
    [J]. Chinese Journal of Electronics, 2018, 27 (02) : 351 - 358
  • [5] An Improved Differential Evolution Biogeography-Based Optimization Algorithm
    Wang, Ning
    Yang, Benben
    Liu, Xiaohui
    Wei, Lisheng
    Sheng, Xu
    Lu, Huacai
    [J]. 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 224 - 229
  • [6] Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm
    Chang, Chunguang
    Han, Mengyao
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [7] An improved hybrid biogeography-based optimization algorithm for constrained optimization problems
    Long, Wen
    Liang, Ximing
    Xu, Songjin
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MATERIAL, MECHANICAL AND MANUFACTURING ENGINEERING, 2015, 27 : 710 - 714
  • [8] Optimal Scheduling of Microgrid Considering the Interruptible Load Shifting Based on Improved Biogeography-Based Optimization Algorithm
    Li, Bo
    Deng, Hongsheng
    Wang, Jue
    [J]. SYMMETRY-BASEL, 2021, 13 (09):
  • [9] Power grid partition with improved biogeography-based optimization algorithm
    Liu, Fangyu
    Gu, Bruce
    Qin, Shuwen
    Zhang, Kaiyan
    Cui, Lei
    Xie, Gang
    [J]. SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2021, 46
  • [10] Scenario-Based Robust Remanufacturing Scheduling Problem Using Improved Biogeography-Based Optimization Algorithm
    Zhang, Wenyu
    Shi, Jiaxuan
    Zhang, Shuai
    Chen, Mengjiao
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (06): : 3414 - 3427