共 50 条
- [2] An Improved Biogeography-Based Optimization Algorithm for Flow Shop Scheduling Problem [J]. 2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, : 59 - 63
- [6] A Greedy Biogeography-Based Optimization Algorithm for Job Shop Scheduling Problem with Time Lags [J]. INTERNATIONAL JOINT CONFERENCE SOCO'18-CISIS'18- ICEUTE'18, 2019, 771 : 489 - 499
- [7] A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem [J]. The International Journal of Advanced Manufacturing Technology, 2012, 58 : 1115 - 1129
- [8] A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (9-12): : 1115 - 1129