A probabilistic model to improve reconciliation of estimated and actual grade in open-pit mining

被引:0
|
作者
Ali Parhizkar
Mohamad Ataei
Parviz Moarefvand
Vamegh Rasouli
机构
[1] Islamic Azad University,Department of Mining Engineering, Science and Research Branch
[2] Shahrood University,Department of Mining Engineering
[3] Amirkabir University of Technology,Department of Mining and Metallurgical Engineering
[4] Curtin University,Department of Petroleum Engineering
来源
关键词
Reconciliation; Uncertainty; Open pit; Ore grade;
D O I
暂无
中图分类号
学科分类号
摘要
Many of the open-pit mines suffer from the lack of reconciliation between estimated and actual grades. In a mining operation, grade reconciliation is the comparison between the values of the estimated grade calculated in exploration stage and the actual grade obtained from more reliable data such as blast holes’ samples. Many different factors affect the degree of reconciliation in a mining operation. In this paper, the factors related to estimated grade which affect the reconciliation process in the exploration stage of the orebody are investigated. These factors constitute the sources of uncertainty for the upcoming phases of the mining life. Among these parameters, the inherent variability, statistical uncertainty, and systematic uncertainty are the most important factors. In this work, these parameters are studied in further detail, and, accordingly, for each of these uncertainties, a correction factor is determined in the proposed model. The model was applied to the study of real data taken from an iron open-pit mine in Iran. The results of the case study indicated that the systematic uncertainty, inherent variability, and statistical uncertainty are, in order, the main sources of uncertainty on grade reconciliation process. Applying the correction factors to estimated grade values has increased the amount of grade reconciliation from 10%, at original condition, to 50%, at new condition, in the case study.
引用
收藏
页码:1279 / 1288
页数:9
相关论文
共 50 条
  • [31] OPEN-PIT LIGNITE MINING IN SPAIN.
    Anon
    [J]. Colliery guardian Redhill, 1982, 230 (10): : 495 - 503
  • [32] Energy analysis of open-pit coal mining
    M. V. Kurlenya
    A. S. Tanaino
    [J]. Journal of Mining Science, 1997, 33 : 453 - 462
  • [33] Optimization of Open-Pit Mining by the Gradient Method
    Grigorenko N.L.
    Kamzolkin D.V.
    Pivovarchuk D.G.
    [J]. Computational Mathematics and Modeling, 2016, 27 (3) : 351 - 359
  • [34] POLICY ANALYSIS MODEL FOR OPEN-PIT MINING ENTERPRISES - POLICY ANALYSIS MODEL FOR UNDERGROUND MINING ENTERPRISES
    TAYLOR, HK
    [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1986, 95 : A213 - A214
  • [35] Protest, Power, and the Pit FIGHTING OPEN-PIT MINING IN BUTTE, MONTANA
    Leech, Brian
    [J]. MONTANA-THE MAGAZINE OF WESTERN HISTORY, 2012, 62 (02) : 24 - 43
  • [36] EXPERIENCE IN ORE RESERVES EXTRACTION IN OPEN-PIT BORDERS AND BOTTOM IN TRANSITION FROM OPEN-PIT TO UNDERGROUND MINING
    Tankov, M. S.
    Shelkovy, I. S.
    [J]. JOURNAL OF MINING INSTITUTE, 2012, 198 : 37 - 42
  • [37] Optimal cut-off grade determination based on variable capacities in open-pit mining
    Abdollahisharif, J.
    Bakhtavar, E.
    Anemangely, M.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2012, 112 (12) : 1065 - 1069
  • [38] Estimation of Rock Mass Strength in Open-Pit Mining
    Pavlovich, Anton A.
    Korshunov, Vladimir A.
    Bazhukov, Aleksandr A.
    Melnikov, Nikita Ya
    [J]. JOURNAL OF MINING INSTITUTE, 2019, 239 : 502 - 509
  • [39] Mining and Environmental Monitoring at Open-Pit Mineral Deposits
    Belova, Margarita
    Iakovleva, Emiliia
    Popov, Anton
    [J]. JOURNAL OF ECOLOGICAL ENGINEERING, 2019, 20 (05): : 172 - 178
  • [40] OPEN-PIT MINING AT SYNCRUDE OIL SANDS PLANT
    REGENSBURG, BO
    [J]. MINING CONGRESS JOURNAL, 1981, 67 (06): : 40 - &