Optimal Inspection and Preventive Maintenance Scheduling of Mining Equipment

被引:1
|
作者
Enzo Angeles
Mustafa Kumral
机构
[1] McGill University,Department of Mining and Materials Engineering
关键词
Equipment reliability; Inspection interval; Virtual age; General renewal process; Preventive maintenance (PM); Corrective maintenance (CM); Mining industry;
D O I
暂无
中图分类号
学科分类号
摘要
A typical mining company has three important assets: the human labor-force, the orebody, and the equipment. Trucks, excavators, drilling machines, crushers, grinders, classifiers, and concentrators represent the equipment. Mining operations that want to take advantage of economies of scale have huge equipment fleet, and the worth of the equipment could be more than a hundred million dollars. The reliability and availability of this equipment play critical roles in increasing the efficiency and productivity of a mining operation. This paper proposes an effective maintenance management approach to be used in the mining industry such that equipment availability and reliability are improved while potential failures are prevented. Using failure data of a mining truck fleet in an open-pit Canadian mining operation, a case study is conducted in two steps. The first step focuses on determining optimal inspection intervals based on the desired reliability level in such a way as to detect potential catastrophic failures that represent considerable maintenance and downtime costs. The second step develops a preventive maintenance scheduling plan that differentiates between physical and virtual age considering the degradation of systems and their rejuvenation after each repair. The research outcomes show that the proposed approach has the potential to increase the benefit obtained from the mining equipment and can be used in mining operations.
引用
收藏
页码:1408 / 1416
页数:8
相关论文
共 50 条
  • [21] RESEARCH OF THE OPTIMAL VARIABLE DEFECTS OF THE PREVENTIVE MAINTENANCE OF MEDICINAL EQUIPMENT
    Pongrac, Dalibor
    Kondic, Zivko
    Kondic, Veljko
    Horvat, Marko
    TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2019, 13 (02): : 139 - 148
  • [22] Optimal hybrid imperfect preventive maintenance policy for leased equipment
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    IFAC PAPERSONLINE, 2017, 50 (01): : 13698 - 13703
  • [23] Optimal preventive maintenance policies for equipment under condition monitoring
    Yao, Yun-Zhi
    Meng, Chen
    Wang, Cheng
    Tian, Zai-Ke
    Feng, De-Long
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (12): : 2968 - 2975
  • [24] Optimal preventive maintenance of leased equipment with corrective minimal repairs
    Jaturonnatee, J.
    Murthy, D. N. P.
    Boondiskulchok, R.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (01) : 201 - 215
  • [26] Batch production and preventive maintenance scheduling under equipment failure uncertainty
    Sanmarti, E
    Espuna, A
    Puigjaner, L
    COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 (10) : 1157 - 1168
  • [27] MAINTENANCE AND INSPECTION OF EQUIPMENT
    PUTNAM, WHH
    SEWAGE AND INDUSTRIAL WASTES, 1950, 22 (11): : 1497 - 1500
  • [28] Optimal maintenance strategy of deteriorating system under imperfect maintenance and inspection using mixed inspection scheduling
    Minh Duc Le
    Tan, Cher Ming
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 113 : 21 - 29
  • [29] Optimal scheduling of the next preventive maintenance activity for a wind farm
    Yu, Quanjiang
    Patriksson, Michael
    Sagitov, Serik
    WIND ENERGY SCIENCE, 2021, 6 (03) : 949 - 959
  • [30] SEVERAL OBJECTIVE CRITERIA FOR OPTIMAL GENERATOR PREVENTIVE MAINTENANCE SCHEDULING
    ZURN, HH
    QUINTANA, VH
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1977, 96 (03): : 984 - 992