Fuzzy priority rule for job shop scheduling

被引:0
|
作者
Yavuz Burak Canbolat
Emin Gundogar
机构
[1] Wayne State University,Department of Industrial and Manufacturing Engineering
[2] Sakarya University,Engineering Faculty, Department of Industrial Engineering
来源
关键词
Scheduling; priority rules; fuzzy logic; FPR;
D O I
暂无
中图分类号
学科分类号
摘要
Job shop scheduling uses various kinds of priority rules such as SPT, CR, COVERT, etc. Each of these rules aims at satisfying a single criterion though scheduling is a multi criteria problem. In this paper, a new approach using fuzzy logic is introduced to combine SPT, CR priority rules, and next machine's load (NML) rate the job to be processed next in order to satisfy not only a single objective but also all objectives. Fuzzy logic calculates priority value by considering SPT, CR, and NML. We named this priority rule as fuzzy priority rule (FPR). The job with the highest priority value is assigned to machine to be processed. To compare FPR with other priority rules such as SPT, EDD, etc. we run simulation. The results indicate significant improvements on mean flow time, mean tardiness, work in process (WIP), and throughput simultaneously.
引用
收藏
页码:527 / 533
页数:6
相关论文
共 50 条
  • [31] Job shop scheduling with dynamic fuzzy selection of dispatching rules
    Subramaniam, V
    Ramesh, T
    Lee, GK
    Wong, YS
    Hong, GS
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2000, 16 (10): : 759 - 764
  • [32] Artificial bee colony algorithm for fuzzy job shop scheduling
    Zheng, You-Lian
    Li, Yuan-Xiang
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 44 (02) : 124 - 129
  • [33] Job Shop Scheduling with Dynamic Fuzzy Selection of Dispatching Rules
    V. Subramaniam
    T. Ramesh
    G. K. Lee
    Y. S. Wong
    G. S. Hong
    [J]. The International Journal of Advanced Manufacturing Technology, 2000, 16 : 759 - 764
  • [34] Job-shop scheduling problem with fuzzy processing times
    Lin, FT
    [J]. COMPUTATIONAL SCIENCE -- ICCS 2001, PROCEEDINGS PT 2, 2001, 2074 : 409 - 418
  • [35] Flexible job-shop fuzzy scheduling based on fuzzy delivery deadline
    Zhao, Lili
    Chen, Chao
    [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (01): : 51 - 56
  • [36] PRIORITY DISPATCHING AND JOB LATENESS IN A JOB SHOP
    CONWAY, RW
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING, 1965, 16 (04): : 228 - &
  • [37] SIMULATION STUDIES IN JOB SHOP SCHEDULING .2. PERFORMANCE OF PRIORITY RULES
    KIRAN, AS
    SMITH, ML
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1984, 8 (02) : 95 - 105
  • [38] A PRIORITY-BASED GENETIC ALGORITHM FOR A FLEXIBLE JOB SHOP SCHEDULING PROBLEM
    Cinar, Didem
    Oliveira, Jose Antonio
    Topcu, Y. Ilker
    Pardalos, Panos M.
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2016, 12 (04) : 1391 - 1415
  • [39] Creating a Multi-iterative-Priority-Rule for the Job Shop Scheduling Problem with Focus on Tardy Jobs via Genetic Programming
    Froehlich, Georg E. A.
    Kiechle, Guenter
    Doerner, Karl F.
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION, LION 12, 2019, 11353 : 64 - 77
  • [40] An efficient priority rule for scheduling job shops to minimize mean tardiness
    Weng, Michael X.
    Ren, Haiying
    [J]. IIE TRANSACTIONS, 2006, 38 (09) : 789 - 795