Scheduling;
Due date assignment;
Batching;
Number of tardy jobs;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
We study a supply chain scheduling problem, where a common due date is assigned to all jobs and the number of jobs in delivery batches is constrained by the batch size. Our goal is to minimize the sum of the weighted number of tardy jobs, the due-date-assignment costs and the batch-delivery costs. We show that some well-known \documentclass[12pt]{minimal}
\usepackage{amsmath}
\usepackage{wasysym}
\usepackage{amsfonts}
\usepackage{amssymb}
\usepackage{amsbsy}
\usepackage{mathrsfs}
\usepackage{upgreek}
\setlength{\oddsidemargin}{-69pt}
\begin{document}$\mathcal{NP}$\end{document}-hard problems reduce to our problem. Then we propose a pseudo-polynomial algorithm for the problem, establishing that it is \documentclass[12pt]{minimal}
\usepackage{amsmath}
\usepackage{wasysym}
\usepackage{amsfonts}
\usepackage{amssymb}
\usepackage{amsbsy}
\usepackage{mathrsfs}
\usepackage{upgreek}
\setlength{\oddsidemargin}{-69pt}
\begin{document}$\mathcal{NP}$\end{document}-hard only in the ordinary sense. Finally, we convert the algorithm into an efficient fully polynomial time approximation scheme.
机构:
Zhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R ChinaZhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R China
Guo, Shuen
Lang, Hao
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Hong Kong, Peoples R ChinaZhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R China
Lang, Hao
Zhang, Hanxiang
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Hong Kong, Peoples R ChinaZhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R China