A Study on Method of Vertical Zoning of Construction Lift for High-rise Building based on Lift Planning & Operation History Database

被引:0
|
作者
Joonghwan Shin
Soonwook Kwon
Daeyoon Moon
Suwan Chung
Kyuhyup Lee
机构
[1] Sunkyunkwan University,Dept. of Convergence Engineering for Future City
[2] Sungkyunkwan University,School of Civil & Architectural Engineering
来源
关键词
construction lift; vertical zoning; Embedded Lift Information System (ELIS);
D O I
暂无
中图分类号
学科分类号
摘要
As the height and size of urban buildings constructed in cities in Korea have recently increased, vertical lift planning and operation is a key factor for the successful project of a tall building. Although many studies have attempted to set up a lift planning system at an early stage, a real-time lift operation control system with respect to the construction stage has yet to be proposed. Therefore, in this study, the sensor module and storage device named the Embedded Lift Information System (ELIS) was used to collect the lift operating data for improvement of lift operation efficiency in order to develop an optimum lift operating analysis system which could perform real-time analysis. Finally, the pattern of operation data of the lift was analyzed and the lift event of the next day was derived. In addition, we verified the efficiency of the proposed optimum vertical zoning simulation system using the expected lift event extracted from the operation history data pattern. In this paper, the proposed system provides more efficient vertical zoning alternatives for the lift manager. This simulation based decision making tool reduces the user’s queuing time compared with the previous system. This system is expected to contribute to high-rise building construction of over 400 m.
引用
收藏
页码:2664 / 2677
页数:13
相关论文
共 50 条
  • [1] A Study on Method of Vertical Zoning of Construction Lift for High-rise Building based on Lift Planning & Operation History Database
    Shin, Joonghwan
    Kwon, Soonwook
    Moon, Daeyoon
    Chung, Suwan
    Lee, Kyuhyup
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2664 - 2677
  • [2] Optimization of flexible lift processes on high-rise building construction sites
    Yazdi, Alireza Jalali
    Forsythe, Perry
    Fini, Alireza Ahmadian Fard
    Maghrebi, Mojtaba
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 107
  • [3] Agent-Based Lift System Simulation Model for High-Rise Building Construction Projects
    Jung, Minhyuk
    Park, Moonseo
    Lee, Hyun-Soo
    Chi, Seokho
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (06)
  • [4] The Study on Safety Management of High-rise Construction Lift Platform Based on Entropy Method and Grey Theory
    Zhao, Jinxian
    Li, Fan
    Liu, Min
    Li, Long
    [J]. Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 1642 - 1645
  • [5] Mathematical model to optimally solve the lift planning problem in high-rise construction projects
    Yazdi, Alireza Jalali
    Maghrebi, Mojtaba
    Bazaz, Jafar Bolouri
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 92 : 120 - 132
  • [6] Design methods of integral-lift tubular steel scaffolds for high-rise building construction
    Yue, F.
    Li, G. Q.
    Yuan, Y.
    [J]. STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2012, 21 (01): : 46 - 56
  • [7] An innovative crane-lift path planning system for high-rise modular integrated construction
    Aimin Zhu
    Wei Pan
    [J]. Construction Robotics, 2022, 6 (2) : 133 - 150
  • [8] Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction
    Park, Moonseo
    Ha, Sungbong
    Lee, Hyun-Soo
    Choi, Yoon-Ki
    Kim, Hyunsoo
    Han, Sangwon
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 32 : 88 - 95
  • [9] Implementation of Construction Performance Database Prototype for Curtain Wall Operation in High-Rise Building Construction
    Han, Seungwoo
    Lee, Taehee
    Ko, Yongho
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2014, 13 (01) : 149 - 156
  • [10] Crane-lift path planning for high-rise modular integrated construction through metaheuristic optimization and virtual prototyping
    Zhu, Aimin
    Zhang, Zhiqian
    Pan, Wei
    [J]. AUTOMATION IN CONSTRUCTION, 2022, 141