Optimization of flexible lift processes on high-rise building construction sites

被引:4
|
作者
Yazdi, Alireza Jalali [1 ]
Forsythe, Perry [1 ]
Fini, Alireza Ahmadian Fard [1 ]
Maghrebi, Mojtaba [2 ]
机构
[1] Univ Technol Sydney, Sch Built Environm, Sydney, NSW, Australia
[2] Ferdowsi Univ Mashhad, Dept Civil Engn, Mashhad, Razavi Khorasan, Iran
关键词
SIMULATION; ALGORITHM; TIME;
D O I
10.1016/j.autcon.2019.102939
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Timely delivery of materials and laborers to workface is critical to the smooth progression of a task on the construction site. This subject is of particular importance in high-rise building projects where the vertical transportation may turn into a bottleneck in the delivery process, if not precisely planned. In such contexts, lift cars represent a contested resource for movement of people and materials and any delayed lifting leads to disrupted tasks on the building floors. The available literature predominantly relies on predefined or rule-based scenarios in addressing the lifting problem which may result in suboptimal solutions to the operation of the lifts. Therefore, this research aims to develop a holistic mathematical model which identifies the optimum operational plan for the entire lift systems in high rise construction. The model has a mixed integer nature incorporating characteristics and constraints of lift cars, construction resources and activities, and site conditions. The optimality is targeted through minimum travel time both at the whole scale and for a single lift car. To improve generalizability, the model has been adapted to variant lift optimization problems under different construction scenarios. It is then integrated with the zoning problem in order to determine optimal zoning configuration for a given lift system. The model is tested on a hypothetical case replicating complexities and constraints of real-world situations. The results indicate that the model can efficiently find an optimal solution for the lift systems which imposes minimum vertical travel time to the project.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Optimization of shoring/reshoring levels in high-rise building construction
    Sohoni, Prachi
    Ghaffar, Abdul
    Matsagar, Vasant A.
    Jha, K. N.
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1803 - 1826
  • [2] A Framework for the Assessment of Energy Use of High-Rise Building Construction Processes
    Devi, L. Pinky
    Palaniappan, Sivakumar
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1010 - 1019
  • [3] Agent-Based Lift System Simulation Model for High-Rise Building Construction Projects
    Jung, Minhyuk
    Park, Moonseo
    Lee, Hyun-Soo
    Chi, Seokho
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (06)
  • [4] Design methods of integral-lift tubular steel scaffolds for high-rise building construction
    Yue, F.
    Li, G. Q.
    Yuan, Y.
    [J]. STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2012, 21 (01): : 46 - 56
  • [5] Construction Technology of High-rise Building Structure
    Cheng, Peng
    Chen, Xinfu
    Wu, Lang
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2316 - +
  • [6] A Study on Method of Vertical Zoning of Construction Lift for High-rise Building based on Lift Planning & Operation History Database
    Joonghwan Shin
    Soonwook Kwon
    Daeyoon Moon
    Suwan Chung
    Kyuhyup Lee
    [J]. KSCE Journal of Civil Engineering, 2018, 22 : 2664 - 2677
  • [7] A Study on Method of Vertical Zoning of Construction Lift for High-rise Building based on Lift Planning & Operation History Database
    Shin, Joonghwan
    Kwon, Soonwook
    Moon, Daeyoon
    Chung, Suwan
    Lee, Kyuhyup
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2664 - 2677
  • [8] Analysis of noise on construction sites of high-rise buildings
    Barkokebas, Beda, Jr.
    Vasconcelos, Bianca M.
    Lago, Eliane Maria G.
    Alcoforador, Aline Fabiana P.
    [J]. WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2012, 41 : 2982 - 2990
  • [9] Emulation Analysis for Construction Process of High-rise Building
    Pei, Fangqiong
    Zhang, Qilin
    [J]. MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 3032 - 3035
  • [10] Rating estimation of sustainability in the construction of high-rise building
    Sheina, Svetlana
    Belash, Vladimir
    Ulianskaia, Vera
    [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110