Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine

被引:9
|
作者
Jin Yulan
Jiang Zuhua
Hou Wenrui
机构
[1] Shanghai Jiaotong University,School of Mechanical Engineering
关键词
Preventive maintenance planning; Production scheduling; Multi-objective optimization; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
Preventive maintenance (PM) planning and production scheduling are among the most important problems in the manufacturing industries. Researchers have begun to investigate the integrated optimization problem of PM and production scheduling with a single objective. However, many industries have trade-offs in their scheduling problems where multiple objectives must be considered in order to optimize the overall performance of the system. In this paper, five objectives, including minimizing maintenance cost, makespan, total weighted completion time of jobs, total weighted tardiness, and maximizing machine availability are simultaneously considered to optimize the integrated problem of PM and production scheduling introduced by Cassady and Kutanoglu. Multi-objective genetic algorithm (MOGA) is used to solve the integrated optimization problem. To illuminate the conflicting nature of the objective functions, decision-makers’ preferences of the multiple objectives are not integrated into the MOGA. The total weighted percent deviation, which represents not only the preferences of the objectives but also the deviations of the solutions, is proposed to help decision-makers select the best solution among the near-Pareto optimal solutions obtained by the MOGA. A numerical example reveals the necessity and significance of integrating optimization of PM and production scheduling considering multiple objectives.
引用
收藏
页码:954 / 964
页数:10
相关论文
共 50 条
  • [41] A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes
    Hui Wang
    Buyun Sheng
    Qibing Lu
    Xiyan Yin
    Feiyu Zhao
    Xincheng Lu
    Ruiping Luo
    Gaocai Fu
    [J]. Soft Computing, 2021, 25 : 2863 - 2889
  • [42] MULTI-OBJECTIVE INITIAL PREVENTIVE MAINTENANCE SCHEDULING FOR LARGE ENGINEERING PLANTS
    Verma, A. K.
    Ramesh, P. G.
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2007, 14 (03): : 241 - 250
  • [43] A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes
    Wang, Hui
    Sheng, Buyun
    Lu, Qibing
    Yin, Xiyan
    Zhao, Feiyu
    Lu, Xincheng
    Luo, Ruiping
    Fu, Gaocai
    [J]. SOFT COMPUTING, 2021, 25 (04) : 2863 - 2889
  • [44] Multi-objective optimization for sustainable production planning
    Kumawat, Piyush Kumar
    Sinha, Rakesh Kumar
    Chaturvedi, Nitin Dutt
    [J]. ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2021, 40 (06)
  • [45] An Optimization Model Integrated Production Scheduling and Preventive Maintenance for Group Production
    Liao, Wenzhu
    Zhang, Xiufang
    Jiang, Min
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 936 - 940
  • [46] AN INTEGRATED MODEL OF PRODUCTION SCHEDULING AND MAINTENANCE PLANNING UNDER IMPERFECT PREVENTIVE MAINTENANCE
    Chen, Xiaohui
    Xiao, Lei
    Zhang, Xinghui
    Xiao, Weixiao
    Li, Junxing
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (01): : 70 - 79
  • [47] Joint optimization of production scheduling and machine group preventive maintenance
    Xiao, Lei
    Song, Sanling
    Chen, Xiaohui
    Coit, David W.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2016, 146 : 68 - 78
  • [48] A Priority Based Optimization Algorithm for Multi-objective Integrated Process Planning and Scheduling Problem
    Ausaf, Muhammad Farhan
    Li, Xinyu
    Liang, Gao
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 1327 - 1331
  • [49] Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization
    Wang, Du-Juan
    Liu, Feng
    Wang, Jian-Jun
    Wang, Yan-Zhang
    [J]. SOFT COMPUTING, 2016, 20 (04) : 1635 - 1652
  • [50] Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization
    Du-Juan Wang
    Feng Liu
    Jian-Jun Wang
    Yan-Zhang Wang
    [J]. Soft Computing, 2016, 20 : 1635 - 1652