Indeterminacy in Production Planning at Industrial Enterprises

被引:0
|
作者
Burdina A.A. [1 ]
Fausi E.S.A. [1 ]
Borodina N.A. [1 ]
机构
[1] Moscow Aviation Institute, Moscow
关键词
budgeting; commodity program; indeterminacy; neural-network model; prediction; production program;
D O I
10.3103/S1068798X2401009X
中图分类号
学科分类号
摘要
Abstract: The indeterminacy in developing commodity programs at industrial enterprises is identified. Methods of analysis are considered. It is found that, in developing commodity programs at industrial enterprises, price, time, and production factors may expediently be taken into account by means of a neural network trained using information flows. A neural-network model is proposed for predicting the price indeterminacy of material resources for production when developing commodity programs at industrial enterprises. © Allerton Press, Inc. 2024. ISSN 1068-798X, Russian Engineering Research, 2024, Vol. 44, No. 1, pp. 158–161. Allerton Press, Inc., 2024. Russian Text The Author(s), 2023, published in STIN, 2023, No. 12, pp. 75–79.
引用
收藏
页码:158 / 161
页数:3
相关论文
共 50 条
  • [31] THE DEVELOPMENT OF THE INSTITUTIONAL CAPACITY MONITORING TOOLS IN THE STRATEGIC PLANNING OF THE INDUSTRIAL ENTERPRISES
    Bykova, Elena
    [J]. INNOVATION MANAGEMENT, ENTREPRENEURSHIP AND CORPORATE SUSTAINABILITY (IMECS 2016), 2016, : 77 - 84
  • [32] RESEARCH FOR WORK TIME STRUCTURES FEATURES IN INDUSTRIAL PRODUCTION ENTERPRISES
    Car, Miroslav
    Kolacny, Tomislav
    Lulic, Goran
    Rajko, Ivan
    [J]. SIXTH INTERNATIONAL SYMPOSIUM ABOUT FORMING AND DESIGN IN MECHANICAL ENGINEERING, 2010, : 211 - 218
  • [33] Application of modern industrial engineering in production management of coal enterprises
    Duan, Yuling
    Xing, Baolin
    Song, Hongna
    [J]. Progress in Mining Science and Safety Technology, Pts A and B, 2007, : 2196 - 2198
  • [34] PRODUCTION BRIGADES IN INDUSTRIAL-ENTERPRISES - RUSSIAN - LOBANOV,NA
    KOHOUT, J
    [J]. SOCIOLOGICKY CASOPIS, 1986, 22 (02): : 184 - 186
  • [35] HYBRID INTELLIGENT ALGORITHMS FOR INDUSTRIAL PRODUCTION PLANNING
    Vasant, P.
    [J]. PROCEEDINGS OF THE SIXTH GLOBAL CONFERENCE ON POWER CONTROL AND OPTIMIZATION, 2012, 1499 : 325 - 331
  • [36] A PRODUCTION PLANNING PROBLEM FOR AN INDUSTRIAL-ASSOCIATION
    SHOR, NZ
    ZHURBENKO, NG
    KUNTSEVICH, AV
    [J]. CYBERNETICS, 1989, 25 (05): : 629 - 634
  • [37] Production planning for an industrial product of a new design
    Ferapontov, A.
    [J]. Standarty i Kachestvo, 2001, (7-8): : 75 - 78
  • [38] Integrated production and distribution planning for an industrial conglomerate
    Gutierrez Franco, Edgar
    Fuquen Gonzalez, Hermann
    Abril Hernandez, Danilo
    [J]. REVISTA FACULTAD DE INGENIERIA-UNIVERSIDAD DE ANTIOQUIA, 2010, (53): : 88 - 105
  • [39] Demographic change in focus of production enterprises Planning today for tomorrow
    Dombrowski, U.
    Schulze, S.
    Zahn, T.
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 856 - 860
  • [40] ON NECESSITY TO INTRODUCE INNOVATIVE PRODUCTION PLANNING AT RUSSIAN METALLURGICAL ENTERPRISES
    Savchenko, Natalya
    [J]. RRI 2016 - INTERNATIONAL CONFERENCE RESPONSIBLE RESEARCH AND INNOVATION, 2017, 26 : 881 - 888