Seismic analysis of high-speed railway irregular bridge–track system considering V-shaped canyon effect

被引:0
|
作者
Zhihui Zhu
Yongjiu Tang
Zhenning Ba
Kun Wang
Wei Gong
机构
[1] Central South University,Department of Civil Engineering
[2] National Engineering Laboratory for High Speed Railway Construction,Department of Civil Engineering
[3] Tianjin University,undefined
来源
关键词
V-shaped canyon; Nonlinear seismic response; Irregular bridge; Simply supported railway bridge; Analytical solution; Topography effect;
D O I
暂无
中图分类号
学科分类号
摘要
To explore the effect of canyon topography on the seismic response of railway irregular bridge–track system that crosses a V-shaped canyon, seismic ground motions of the horizontal site and V-shaped canyon site were simulated through theoretical analysis with 12 earthquake records selected from the Pacific Earthquake Engineering Research Center (PEER) Strong Ground Motion Database matching the site condition of the bridge. Nonlinear seismic response analyses of an existing 11-span irregular simply supported railway bridge–track system were performed under the simulated spatially varying ground motions. The effects of the V-shaped canyon topography on the peak ground acceleration at bridge foundations and seismic responses of the bridge–track system were analyzed. Comparisons between the results of horizontal and V-shaped canyon sites show that the top relative displacement between adjacent piers at the junction of the incident side and the back side of the V-shaped site is almost two times that of the horizontal site, which also determines the seismic response of the fastener. The maximum displacement of the fastener occurs in the V-shaped canyon site and is 1.4 times larger than that in the horizontal site. Neglecting the effect of V-shaped canyon leads to the inappropriate assessment of the maximum seismic response of the irregular high-speed railway bridge–track system. Moreover, engineers should focus on the girder end to the left or right of the two fasteners within the distance of track seismic damage.
引用
收藏
页码:57 / 70
页数:13
相关论文
共 50 条
  • [31] Vibrations of Bridge / Track Structure / High-Speed Train System with Vertical Irregularities of the Railway Track
    Podworna, M.
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 148 - 153
  • [32] Dynamic analysis of railway bridges exposed to high-speed trains considering the vehicle–track–bridge–soil interaction
    Paul König
    Patrick Salcher
    Christoph Adam
    Benjamin Hirzinger
    Acta Mechanica, 2021, 232 : 4583 - 4608
  • [33] Seismic Responses of a High-speed Railway (HSR) Bridge and Track Simulation under Longitudinal Earthquakes
    Wei, Biao
    Wang, Wei-Hao
    Wang, Peng
    Yang, Tian-Han
    Jiang, Li-Zhong
    Wang, Teng
    JOURNAL OF EARTHQUAKE ENGINEERING, 2022, 26 (09) : 4449 - 4470
  • [34] The Analysis of High-Speed Railway Seismic-induced Track Geometric Irregularity
    Li, Guolong
    Yang, Fei
    Gao, Mangmang
    Sun, Wentao
    Qu, Xiangyu
    ACTA POLYTECHNICA HUNGARICA, 2024, 21 (01) : 51 - 72
  • [35] Energy response analysis and seismic isolation strategy optimization of high-speed railway bridge-track system under earthquake action
    Wei, Biao
    Xiao, Binqi
    Tan, Hao
    Yang, Zhixing
    Jiang, Lizhong
    Yu, Yujie
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2024, 186
  • [36] The effect of high-speed railway train on the seismic response of bridge under earthquakes
    Guo, Wei
    He, Xuen
    Jiang, Lizhong
    Yu, Zhiwu
    Wang, Yang
    Zeng, Chen
    Liang, Guangyue
    Nie, Yutao
    Wu, Sirun
    ENGINEERING STRUCTURES, 2024, 303
  • [37] Effects of uncertain characteristic periods of ground motions on seismic vulnerabilities of a continuous track–bridge system of high-speed railway
    Biao Wei
    Tianhan Yang
    Lizhong Jiang
    Xuhui He
    Bulletin of Earthquake Engineering, 2018, 16 : 3739 - 3769
  • [38] Beam-track interaction of high-speed railway bridge with ballast track
    闫斌
    戴公连
    张华平
    Journal of Central South University, 2012, 19 (05) : 1447 - 1453
  • [39] Beam-track interaction of high-speed railway bridge with ballast track
    Bin Yan
    Gong-lian Dai
    Hua-ping Zhang
    Journal of Central South University, 2012, 19 : 1447 - 1453
  • [40] Beam-track interaction of high-speed railway bridge with ballast track
    Yan Bin
    Dai Gong-lian
    Zhang Hua-ping
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (05) : 1447 - 1453