Risk assessment of physical unit operations of wastewater treatment plant using fuzzy FMEA method: a case study in the northwest of Iran

被引:0
|
作者
Seyed Shamseddin Alizadeh
Yaghoob Solimanzadeh
Saeid Mousavi
Gholam Hossein Safari
机构
[1] Tabriz University of Medical Sciences,Department of Occupational Health Engineering, School of Public Health
[2] Tabriz University of Medical Sciences,Student Research Committee
[3] Tabriz University of Medical Sciences,Department of Statistics and Epidemiology, School of Public Health
[4] Tabriz University of Medical Sciences,Health and Environment Research Center
[5] Tabriz University of Medical Sciences,Department of Environmental Health Engineering, School of Public Health
来源
关键词
Risk assessment; Municipal wastewater; Screening; Grit removal; Fuzzy FMEA;
D O I
暂无
中图分类号
学科分类号
摘要
Failure Mode and Effects Analysis (FMEA) is one of the most used methods in risk assessment and prioritization. This study was conducted to identify, evaluate, prioritize, and analyze risks associated with the physical processes of Sahand municipal wastewater plant using traditional and fuzzy FMEA methods. The present research was a cross-sectional analytical study that was conducted to prioritize the risks of unit operations of screening and grit removal in Sahand municipal wastewater treatment plant for 6 months. First, a team of five experts was formed and the traditional FMEA worksheet was completed. Then, the fuzzy membership functions were determined according to experts’ opinions and using the MATLAB program, and the severity, occurrence, detection, and risk priority number (RPN) became fuzzy and risks were prioritized according to the fuzzy logic outputs. A total of 53 failure modes were identified for screening (26 failures) and grit removal units (27 failures) using the traditional FMEA risk assessment technique. The results of the traditional FMEA method showed that among the 53 identified failure modes, in physical treatment equipment of Sahand municipal wastewater, 51 failures (96.2%) were in the low-risk levels and two failures (3.8%) were in the medium-risk levels. According to the results of the fuzzy FMEA, 5 failures (9.4%) were in the low-risk levels, 43 failures (81.2%) were in the medium-risk levels, and 5 failures (9.4%) were in the high-risk levels. Based on the traditional FMEA, the highest and lowest level of risk belonged to manual screening clogging and conveyor cutting of mechanical screening with RPN of 540 and 12, respectively, whereas in the fuzzy FMEA, the highest and lowest level of risk were related to manual screening clogging and fracture of pump pipes with RPN of 894 and 105, respectively. The finding showed that risk assessment using fuzzy FMEA provides more accurate and better results than traditional FMEA. In the fuzzy FMEA, the involvement of the experts’ opinions in risk assessment and fuzzy models leads to more realistic results, as well as corrective action prioritization is better performed.
引用
收藏
相关论文
共 50 条
  • [31] Life cycle assessment, a decision-making tool in wastewater treatment systems: a case study wastewater treatment plant of Ahvaz, Iran (vol 13, 145, 2023)
    Tayyebi, Fatemeh
    Golabi, Mona
    Jaafarzadeh, Neematollah
    APPLIED WATER SCIENCE, 2024, 14 (01)
  • [32] A quantitative dynamic risk assessment for ship operation using the fuzzy FMEA: The case of ship berthing/unberthing operation
    Goksu, Serap
    Arslan, Ozcan
    OCEAN ENGINEERING, 2023, 287
  • [33] Life cycle assessment of industry wastewater treatment plant: a case study in Vietnam
    Tran, Hung Van
    Phan, Hao Anh
    Bui, Ha Manh
    RSC SUSTAINABILITY, 2025, 3 (03): : 1415 - 1423
  • [34] Risk assessment of ship anchorage handling operations using the fuzzy bow-tie method
    Kaptan, Mehmet
    OCEAN ENGINEERING, 2021, 236 (236)
  • [35] Power Plant Project Risk Assessment Using a Fuzzy-ANP and Fuzzy-TOPSIS Method
    Zegordi, S. H.
    Nik, E. Rezaee
    Nazari, A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2012, 25 (02): : 107 - 120
  • [36] Life-Cycle Assessment (LCA) of Wastewater Treatment Plants: A Case Study of Tehran, Iran
    Massoud Tabesh
    Maryam Feizee Masooleh
    Bardia Roghani
    Seyed Sajed Motevallian
    International Journal of Civil Engineering, 2019, 17 : 1155 - 1169
  • [37] Life-Cycle Assessment (LCA) of Wastewater Treatment Plants: A Case Study of Tehran, Iran
    Tabesh, Massoud
    Masooleh, Maryam Feizee
    Roghani, Bardia
    Motevallian, Seyed Sajed
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (7A) : 1155 - 1169
  • [38] Turnaround project risk assessment using hybrid fuzzy SWARA and EDAS method: case of upstream oil process industries in Iran
    Moniri, Mohammad Reza
    Tabriz, Akbar Alem
    Ayough, Ashkan
    Zandieh, Mostafa
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (04) : 966 - 988
  • [39] Groundwater Vulnerability Assessment Using Fuzzy Logic: A Case Study in the Zayandehrood Aquifers, Iran
    Farshad Rezaei
    Hamid R. Safavi
    Azadeh Ahmadi
    Environmental Management, 2013, 51 : 267 - 277
  • [40] Groundwater Vulnerability Assessment Using Fuzzy Logic: A Case Study in the Zayandehrood Aquifers, Iran
    Rezaei, Farshad
    Safavi, Hamid R.
    Ahmadi, Azadeh
    ENVIRONMENTAL MANAGEMENT, 2013, 51 (01) : 267 - 277